По-русски

Elevation 5642

The Genplan Institute of Moscow has developed a comprehensive development project for three ski resorts in the Caucasus, which have been designated as special economic zones of the tourism and recreation type. The first of these zones is Elbrus. The project includes the construction of new ski runs, cable cars, and hotels, as well as the modernization of stations and improvements to the Azau tourist meadow. To expand the audience and enhance year-round appeal, a network of eco-trails is also being developed. In this article, we provide a detailed breakdown of each stage.

04 March 2025
Object
mainImg
In Russia, more than 3,500,000 people engage in skiing and snowboarding. A significant portion of this flow no longer has skiing vacation in the Alps, opting instead for the more accessible Caucasus, which has dramatically increased the strain on its infrastructure. This makes the issue of sustainable development for existing ski resorts, the creation of new ones, and the overall improvement of service quality especially relevant.

As early as 2010, the Russian government adopted Decree No. 833, “On the Creation of Special Economic Zones and a Tourism Cluster in the North Caucasus Federal District”. The cluster consists of the special zones “Elbrus” in Kabardino-Balkaria, “Mamison” in North Ossetia, “Armkhi” in Ingushetia, “Matlas” in Dagestan, and, last but not least, “Veduchi” in Chechnya. Russia’s Spatial Development Strategy through 2025 designates these zones as key centers of economic growth for the region.

The special economic zone status helps attract investors through tax and customs incentives, as well as by facilitating the accelerated development of transport and utility infrastructure. The latter can largely be ensured through an economically justified and well-balanced project.

Between 2022 and 2023, the Genplan Institute of Moscow developed such a project for three territories – Elbrus, Mamison, and Armkhi – commissioned by the corporation Kavkaz.RF.



High-Altitude Planning

The work was carried out in parallel across all three republics, covering 12,000 hectares of mountainous and high-altitude terrain.

The Genplan Institute of Moscow undertook a comprehensive range of tasks, from engineering surveys to financial and economic modeling and the development of a design code. An additional challenge was the organization of technically complex facilities: cable cars, snowmaking systems, and ski run corridors, all designed with consideration for the region’s unique natural conditions – elevation changes exceeding 3,000 meters, avalanche and mudslide risks, and extreme temperatures. Special attention was also given to environmental regulations.

The result was the approval of planning documentation for three high-altitude ski resorts – Elbrus, Armkhi, and Mamison – which continues to guide their active development.

Each location has its own unique characteristics, shaping the positioning of the resorts.

The Elbrus Tourist and Recreational Complex is positioned as a year-round mountain recreation center of national and international significance, offering a wide variety of leisure activities and services.

One of the key tasks was to create an optimal planning structure in alignment with the main target indicators: projected tourist traffic, accommodation capacity, and the throughput of ski infrastructure facilities.

Upon full development of the Elbrus complex by 2030, the annual guest flow could exceed 920,000 visitors, with the potential to grow to 1,000,000. Accommodation capacity is planned to increase to 730,000 people, while the throughput of ski infrastructure will be significantly expanded through the construction of over 10 kilometers of new cableways and 33 kilometers of ski slopes.

The project places a strong emphasis on year-round use of the area. To achieve this, it was necessary to broaden the target audience and make the resort more family-friendly. The experience should be appealing not only to those with skiing skills but also to a wider range of visitors. In this regard, the concept of year-round usage scenarios for ski resorts plays a decisive role, as defined by the projects. Each of the year-round tourist and recreational complexes has been designed with a set of functions that ensure continuous guest flow, supporting active, wellness, and cultural tourism throughout the year.


Elbrus: Snow All Year Round

The Elbrus Mountain is 5,600 meters tall. Intensive construction of mountaineering camps and tourist bases began here as early as the 1920s. The first cable car line was launched here back in 1969. In March 2024, the resort welcomed a record 103,000 visitors. Notably, the previous surge occurred in August 2023, when 30 kilometers of newly developed eco-trails were opened.

Elbrus’ closest domestic competitors are Dombay, Krasnaya Polyana, and Arkhyz. However, Elbrus boasts features that few other resorts in the world can offer – skiing is possible 365 days a year: for eight months on the high-altitude section and for the rest of the year on the glacier. The ski runs have an elevation difference of over two kilometers, ensuring long descents.



The resort is already undergoing dynamic development and has a well-established infrastructure. At the same time, the ski area holds significant potential for further expansion in line with international standards. In the future, the special economic zone could integrate the Cheget ski resort and the slopes of the Yusengi River valley. There is also vast potential for summer activities, including various guided-tour and hiking routes.



The development of the Elbrus all-season tourist and recreation complex is planned both in the high-altitude area and in the “tourist village” of Azau Meadow. The entire resort zone is located within the specially protected natural territory of the “Priyelbrusye National Park”, which imposes certain restrictions and regulations upon whatever operations you are carrying out here.

Ascents and Descents

The mountain zone is home to the resort’s sports and ski infrastructure: currently, the slope features 13 kilometers of ski runs and more than 9 kilometers of cableways. The cable car stations house restaurants, observation decks, high-altitude shelters, and hotels.





The infrastructure at the cable car stations will be further expanded. At the “Plateau under the Observatory” station (so called!) and within the “Family Park” area at an elevation of 3,000 meters, training slopes will be added, complementing the ski runs of varying difficulty that start here – green, blue, red, and black.

The Mir Station at 3,450 meters will be modernized, with a restaurant, an observation deck, a rest area, and temporary retail facilities built nearby.



Near Gara-Bashi Station, the investment project Elbrus 3847 will introduce new infrastructure: observation decks, restaurants, guesthouses, a meditation pavilion, a snow town, mountain trails, and a helipad. This area will include 90 modular units, accommodating up to 180 tourists.

With the construction of new cableways and ski slopes, the enclave near Ice Base Station at 3,670 meters will see significant development. The site of an abandoned glaciologists’ station will be renovated and repurposed as the Ice Museum.



The legendary Priyut Odinnadtsati (Shelter of Eleven), which burned down in 1998, will be reconstructed. The new high-altitude hotel at 4,060 meters will accommodate up to 120 guests.

  • zooming
  • zooming




At the Foot of the Mountain

The Elbrus Special Economic Zone, spanning 2,600 hectares, serves as the main tourist hub of the Baksan Gorge. Within this area, the Genplan Institute of Moscow is focusing on the immediate development zone, stretching from Azau Meadow to the settlement of Elbrus – a distance of roughly 20 kilometers, which can easily be covered in about 30 minutes by transport. Currently, Azau Meadow can accommodate 1,500 tourists, and if you take into account the nearby settlements of Tegenekli, Terskol, Yusengi, and Elbrus, more than 6,000 visitors can find comfortable lodging within reach of the ski lifts.

Due to the terrain’s constraints, the development capacity of the tourist village is limited, leaving no room for expansion. Consequently, the primary focus has been on organizing and refining the architectural and planning identity of Azau Meadow.



The development of the Elbrus Tourist and Recreational Complex is planned both in the Azau Meadow and in the high-mountain area.

For Azau, the highest priority is structuring its architectural and spatial composition while creating private and semi-private public spaces, which the resort currently lacks. In designing the architectural appearance of both the tourist village and the mountain area, a proposal was made to reconstruct several existing structures to unify them into a cohesive stylistic identity.

Azau’s main square is shaped by the existing buildings and a gentle ski slope exit – the only one in Azau. This sector will be the starting point for Azau’s development: the square will be reorganized and improved, and the construction of the new EL9 cableway station will help distribute visitor flow and reduce the ski lift waiting time.

In the central part of the meadow, a training zone will be introduced for beginners, featuring a conveyor lift, a “green” ski slope, and a tubing hill. The entrance zone to the tourist village will be framed by a cluster of hotels, a sports complex with an ice rink, a spa center with a swimming pool, greenhouses, a climbing center, and an open parking lot for 800 cars.

In the mountain area, the development of sports and ski infrastructure will be complemented by public and business functions.

At the Priut-11 (“Shelter of Eleven”) station, a new high-altitude hotel, “Alpinist Camp” is planned to be built on the site of the former Priut-11 (designed by architect Nikolai Popov), which was lost to a fire. The hotel will recreate the historic image of the original shelter and accommodate 120 guests.

Across the entire special economic zone, including both the high-mountain and valley areas, plans include the construction of over 24 hotels, an increase in restaurant seating capacity to 2,800, and the development of more than 50 kilometers of eco-trails.


  • zooming
    1 / 6
  • zooming
    2 / 6
  • zooming
    3 / 6
  • zooming
    4 / 6
  • zooming
    5 / 6
  • zooming
    6 / 6


Beyond Skiing

The peak season for ski resorts traditionally falls in winter and early spring. As noted earlier, the all-season tourist and recreation complex Elbrus enjoys a significantly longer ski season than any other resort in the North Caucasus – lasting up to 150-165 days, from late November to early May. However, the resort also has plenty to offer visitors during the summer and autumn months.

In the lower part of Azau Meadow, near the Baksan River, plans include the creation of a rope park and a promenade, integrating the existing “Cheget Turn – Azau Waterfall” eco-trail. A network of hiking trails, totaling about 50 kilometers, will weave through the pine forest, serving as a gateway to the extensive eco-trail system of Elbrus, which follows the Baksan Gorge and extends toward Kislovodsk. These trails will showcase the natural beauty of the region while also connecting the visitors to cultural heritage sites within the Elbrus complex, linked to significant 20th-century events.







The Genplan Institute of Moscow’s proposed developments propel the already successful all-season tourist and recreation complex Elbrus into a new phase of growth, transforming it into a world-class, year-round tourist destination that is equally appealing in terms of experience and in terms of visitor comfort. The institute’s comprehensive analysis accounts for all projected development impacts, from transportation to environmental sustainability.

Despite the planned development of additional tourist facilities for year-round operation, the Elbrus complex will still have high, mid, and low seasons, each with distinct occupancy rates and average lengths of stay.

During both winter and off-season periods, the resort is expected to receive over 200,000 visitors per season. The average hotel occupancy in peak season will be around 79%, with an average stay of 5.6 days. In the low season, hotel occupancy will not exceed 48%, and the average length of stay will be about 2.8 days.

A significant portion of winter visitors will be day-trippers – skiing and snowboarding enthusiasts who do not stay overnight in accommodations within the Elbrus region.

The construction of new ski infrastructure, lodging facilities, and sports and tourism venues is expected to increase the number of tourists to 600,000 per year by 2030, while the number of guided-tour visitors could reach 320,000 annually.

To ensure the successful operation of the Elbrus complex and the balanced, sustainable development of the entire Elbrus region, it will be essential to modernize the tourism infrastructure in the Baksan River Valley, with a primary focus on upgrading the Cheget ski complex.


In our upcoming publications, we will explore the Genplan Institute of Moscow’s vision for the development of the Armkhi and Mamisоn resorts.

04 March 2025

Headlines now
Elevation 5642
The Genplan Institute of Moscow has developed a comprehensive development project for three ski resorts in the Caucasus, which have been designated as special economic zones of the tourism and recreation type. The first of these zones is Elbrus. The project includes the construction of new ski runs, cable cars, and hotels, as well as the modernization of stations and improvements to the Azau tourist meadow. To expand the audience and enhance year-round appeal, a network of eco-trails is also being developed. In this article, we provide a detailed breakdown of each stage.
The Heart Lies Within
The second-phase building of the Evgeny Primakov School already won multiple awards while still in the design stage. Now that it’s completed, some unfinished nuances remain – most notably, the exposed ceiling structures, which ideally should have been concealed. However, given the priority placed on the building’s volumetric composition, this does not seem critical. What matters more is the “Wow!” effect created by the space itself.
Magnetic Forces
“Krylatskaya 33” is the first large-scale residential complex to appear amidst the 1980s “micro-districts” that harmoniously coexist with the forests, the river, the slopes, and the sports infrastructure. Despite its imposing scale, the architects of Ostozhenka managed to turn the complex into something that can be best described as a “graceful dominant”. First, they designed the complex with consideration for the style and height of the surrounding micro-districts. Second, by introducing a pause in its tallest section, they created compositional tension – right along the urban planning axis of the area.
Orion’s Belt
The Stone Khodynka 2 office complex, designed by Kleinewelt Architekten for the company Stone, is built with an ergonomic layout following “healthy building” principles: natural light, ventilation, and all the necessary features for an efficient office environment. On the outside, it resembles – like many contemporary buildings – an iPhone: sleek, glowing, glass-and-metal, edges elegantly rounded. Yet, it responds sensitively to the Khodynka context, where the main theme is the contrast between vertical and horizontal lines. The key intrigue lies in the design of the “stylobate” as a suspended passage, leaving the space beneath it open for free pedestrian movement.
Grigory Revzin: “It Was a Bold Statement Made on the Sly. Something Won”
In this article, we discuss the debates surrounding the circus competition and the demolition of the CMEA building with the most renowned architectural critic of our time. A paradox emerges in the process: while nostalgia for the Brezhnev era seems to be in vogue in Russia, a landmark building – the “axis” of the Warsaw Pact – has been sentenced to demolition. Isn’t that strange? We also find out that wow-architecture has made a comeback as a post-COVID trend. However, to make a truly powerful statement, professionals still remain indispensable.
Exposed Concrete
One of the stages of improving a small square in the town of Lermontov was the construction of a skatepark. Entrusting this part of the project to the XSA team, the city gained a 250-meter trick track whose features resemble those of land art objects – unparalleled in Russia in both scale and design. Here’s a look at how the experimental snake run in the foothills of the Caucasus was built.
One Step Closer To the Dream
The challenges of getting all the mandatory approvals, an insufficient budget, and construction site difficulties did not prevent ASADOV Bureau from achieving its main goal in the realization of the school project in the town of Troitsk – taking another step away from outdated notions of educational spaces toward creating a fundamentally new academic environment.
Chalet on the Rock
An Accor hotel in Arkhyz, designed by A.Len, will be situated at the gateway to the resort’s main tourist hubs. The architects reinterpreted the widely popular chalet style while adding an unexpected twist – an unfinished structure preserved on the site. The design team transformed this remnant into an exciting space featuring an open-air pool and a restaurant with panoramic views of the region’s highest mountain ridges.
Sergey Skuratov: “By and large, the project has been realized in line with the original ideas”
In this issue, we talk to the chief architect of Garden Quarters, looking back at the history and key moments of a project that took 18 years to develop and has now finally been completed. What interests us most are the transformations that the project underwent during construction, and the way the “necessary void” of public space was formed, which turned this remarkable complex into a fragment of a whole new type of urban fabric – not just at the horizontal “street” level but in its vertical structure as well.
A Unique Representative
The recently concluded year 2024 can be considered the year of completion for the “Garden Quarters” residential complex in Moscow’s Khamovniki. This project is well-known and, in many ways, iconic. Rarely does one manage to preserve such a number of original ideas, achieving in the end a kind of urban planning Gesamtkunstwerk. Here is a subjective view from an architecture journalist, with an interview with Sergey Skuratov soon to follow.
Field of Life
The new project by the architectural company PNKB (an acronym for “Design, Research, and Advisory Bureau”), led by Sergey Gnedovsky and Anton Lyubimkin, for the Kulikovo Field Museum is dedicated to the field as a concept in its own right. The field has long been a focus of the museum’s thorough and successful research. Accordingly, the exterior of the new museum building is gentler than that of its predecessor, which was also designed by PNKB and dedicated specifically to the historic battle. Inside, however, the building confidently guides the visitor from a luminous atrium along a spiral path to the field – interpreted here as a field of life.
A Paper Clip above the River
In this article, we talk with Vitaly Lutz from the Genplan Institute of Moscow about the design and unique features of the pedestrian bridge that now links the two banks of the Yauza River in the new cluster of Bauman Moscow State Technical University (MSTU). The bridge’s form and functionality – particularly the inclusion of an amphitheater suspended over the river – were conceived during the planning phase of the territory’s development. Typically, this approach is not standard practice, but the architects advocate for it, referring to this intermediate project phase as the “pre-AGR” stage (AGR stands for Architectural and Urban Planning Approval). Such a practice, they argue, helps define key parameters of future projects and bridge the gap between urban planning and architectural design.
Living in the Architecture of One’s Own Making
Do architects design houses for themselves? You bet! In this article, we are examining a new book by TATLIN publishing house. This book – unprecedented for Russia – features 52 private homes designed and built by contemporary architects for themselves. It includes houses that are famous, even iconic, as well as lesser-known ones; large and small, stylish and eccentric. To some extent, the book reflects the history of Russian architecture over the past 30 years.
A City Block Isoline
Another competition project for a residential complex on the banks of the Volga in Nizhny Novgorod has been prepared by Studio 44. A team of architects led by Ivan Kozhin concluded that using a regular block layout in such a location would be inappropriate and developed a “custom design” approach: a chain of parceled multi-section buildings stretching along the entire embankment. Let’s explore the features and advantages of this unconventional method.
Competition: The Price of Creativity?
Any day now, we’re expecting the results of a competition held by the “Samolet” development group for a plot in Kommunarka. In the meantime, we share the impressions of Editor-in-Chief Julia Tarabarina, who managed to conduct a public talk. Though technically focused on the interaction between developers and architects, the public talk turned into a discussion about the pros and cons of architectural competitions.
Terraced Design
The “River Park” residential complex has confidently and securely shaped the Nagatinsky Backwater shoreline. Featuring a public embankment, elevated courtyards connected by pedestrian bridges, and brick façades, the development invites exploration of its nuanced response to the surrounding context, as well as hints of the architects’ megalithic design thinking.
A Kremlin’s Core and Meteorite Fragments
We continue our coverage of the competition projects for the residential district that the development company GloraX plans to build along the embankment of the Rowing Channel in Nizhny Novgorod. ASADOV Architects approached the concept through a deep dive into local identity, using storytelling to pinpoint a central idea for the design: the master plan and composition are imagined as if a meteorite had struck a “proto-Kremlin”. Sounds weird? Find more details below!
The Volga Regatta
GloraX plans to develop a residential complex spanning 14 hectares along the Volga River in Nizhny Novgorod. The winning design in a closed-door competition, created by GORA Architects, features housing typologies ranging from townhouses to terraced high-rise slabs, a balance of functions, diverse ways of engaging with the water, and even a dedicated island (no less!) for the city residents.
Life Plans
The master plan for the residential district “Prityazheniye” (“Gravity”) in Naberezhnye Chelny was developed by the architectural company A.Len, taking into account the specific urban planning context and partially implemented solutions of the first phase. However, the master plan prioritized its own values: a green framework, a system of focal points, a hierarchy of spaces, and pedestrian priority. After this, the question of what residents will do in their neighborhood simply doesn’t arise.
A New Track
We took a thorough look at D_Station, a railcar repair depot dating back to 1906, recently reconstructed while preserving its century-old industrial structure, upon the project by Sergey Trukhanov and T+T Architects. Though work on the interiors – set to house restaurants and public spaces – is still underway, the building’s exterior already offers plenty to see. Visitors can explore the blend of old and new brickwork, appreciate the architect’s unique interpretation of ruin aesthetics, and enjoy the newly built pedestrian route that connects the Citydel Business Center’s arches to Kazakova Street.
Four Different Surveys
The “Explore the City” competition, organized this year by the Genplan Institute of Moscow, stands out as a pretty unconventional one for the architectural field but aligns perfectly well with the character of urban planning work. The winning project analyzed contemporary residential complexes, combining urban planning insights with a realtor’s perspective to propose a hybrid approach. Other entries explored public centers, motivations for car ownership, and housing vacancy rates. A fifth participant withdrew. Here’s a closer look at the four completed works.
Scheduled Evolution
ASADOV Architects unveiled the EvyCenter pavilion, a microcultural hub for fostering personal growth, organizing workshops, and doing gymnastics. Additionally, this pavilion serves as a prototype for a scalable country house, drawing inspiration from the “Loskutok” project, and constructed from CLT panels in a factory. This marks the beginning of a developer project initiated by the architectural firm (sic!), which is seeking partners to expand both small Evy settlements and even larger Evy cities, which are, according to Andrey Asadov, aimed at fostering the “evolutionary” development of the people who will inhabit them.
The Golden Crown
The concept for a dental clinic in Yekaterinburg, developed by CNTR Studio, revolves around the idea of a “mouth full of gold”: pristine white porcelain stoneware walls are complemented by matte brass details. To avoid an overly literal interpretation, the architects focused on the building’s proportions, skillfully navigating between sunlight requirements and fire safety regulations.
Flexibility and Integration
Not long ago, we covered the project for the fourth phase of the ÁLIA residential complex, designed by APEX. Now, we’ve been shown different fence concepts they developed to enclose the complex’s private courtyards, incorporating a variety of public functions. We believe that the sheer fact that the complex’s architects were involved in such a detail as fencing speaks volumes.
A Step Forward
The HIDE residential complex represents a major milestone for ADM architects and their leaders Andrey Romanov and Ekaterina Kuznetsova in their quest for a fresh high-rise aesthetic – one that is flexible and layered, capable of bringing vibrancy to mass and silhouette while shaping form. Over recent years, this approach has become ADM’s “signature style”, with the golden HIDE tower playing a pivotal role in its evolution. Here, we delve into the project’s story, explore the details of the complex’s design, and uncover its core essence.
Gold in the Sands
A new office for a transcontinental company specializing in resource extraction and processing has opened in Dubai. Designed by T+T Architects, masters of creating spaces that are contemporary, diverse, flexible, and original, this project exemplifies their expertise. On the executive floor, a massive brass-clad partition dominates, while layered textures of compressed earth create a contextually resonant backdrop.
Layers and Levels of Flight
This project goes way back – Reserve Union won this architectural competition at the end of 2011, and the building was completed in 2018, so it’s practically “archival”. However, despite being relatively unknown, the building can hardly be considered “dated” and remains a prime example of architectural expression, particularly in the headquarters genre. And it’s especially fitting for an aviation company office. In some ways, it resembles the Aeroflot headquarters at Sheremetyevo but with its own unique identity, following the signature style of Vladimir Plotkin. In this article, we take an in-depth look at the United Aircraft Corporation (UAC) headquarters in the Moscow agglomeration town of Zhukovsky, supplemented by recent photographs from Alexey Naroditsky – a shoot that became only recently possible due to the fact that improvements were finally made in the surrounding area.
Light and Shadow
In this article, we delve into the architectural design of the “Chaika” house by DNK ag architects, which was recently completed in 2023 as part of the collection of signature designs at ZILArt. As is well-known, all the buildings in this complex follow a design code, yet each one is distinct. This particular building stands out not only for its whiteness and minimalism but also for the refined use of a limited number of techniques that, together, create what can confidently be called synergy.
Casus Novae
A master plan was developed for a large residential area with a name of “DNS City”, but now that its implementation began, the plan has been arbitrarily reformatted and replaced with something that, while similar on the surface, is actually quite different. This is not the first time such a thing happens, but it’s always frustrating. With permission from the author, we are sharing Maria Elkina’s post.
Treasure Hunting
The GAFA bureau, in collaboration with Tegola and Arkhitail, organized an expedition to the island of Kilpola in Karelia as part of Moskomarkhitektura’s “Open City” festival. There, amidst moss and rocks, the students sought answers to questions like: what is the sacred, where does it dwell, and what sustains it? Assisting the participants in this quest were landscape engineer Evgeny Levin, artist Nicholas Roerich, a moose, and the lack of cellular connection. Here’s how the story unfolded.