The founder and CEO of Ginsburg Architects shares about the details of the plan for renovating the Narkomfin Building (which is about to begin), about the unique system of engineering lines that Moisey Ginsburg proposed for this building, about the necessity of extra survey of the place, and about the project of organizing the building’s adjacent territory that providers for lowering of the driveway level.

author pht

Interviewed by:
Natalya Muradova, Julia Tarabarina
Translated by:
Anton Mizonov

26 June 2017
Interview
mainImg

Archi.ru:
– Why did you decide to go back to the Narkomfin Building renovation project? You did give up on it back in the day, didn’t you?

Aleksey Ginsburg:
– I didn’t exactly give up on it. I stopped working on it because I realized that nothing was happening except conversation. There were outlaw repairs going on, and they kept smuggling authentic elements out of the building. To make things worse, prospects of building annexes that would serve as garages or fitness centers were seriously discussed. Then I made a decision to distance myself as much as possible from that project.

Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– And when and from what did the new stage of renovation begin? 

– The new stage began in the end of 2015 when the building got a new owner, the company “Liga Prav” (“League of Rights”). It was able to do something that nobody else could do in the last twenty years. It consolidated all the property in the building by simply buying out at an auction the entire building that used to be municipally owned. Mind, these premises are far from attractive – they include corridors and the ground floor that is to be chiefly dismantled. And they also bought out the communal unit, whose top level is also to be dismantled. This company didn’t have any lofty matters or some noble purpose in mind. But if they hadn’t bought it out, no renovation actions would have been possible now.

Once the building got a single owner that has the authority to work with all of its engineering lines and can act as developer and contractor from the legal standpoint, we got the permission to begin our work. I don’t want to name the exact dates because there are other forces at play but the implementation of the project is due to begin in the nearest future. Of course, we will do everything step by step, starting from those parts of the building that are tenant-free.

– And how many people live their currently? Are all the apartments occupied?

– Most of the apartments in that building are rented out, just like they always were. Currently, they have vacated the first two sections for us but, of course, we will work with all the apartments later on.

– What makes the new renovation project different from the old one? 

– This building is really very complex. It has lots of places that I was only able to visit last year, after the building got bought out. And it was only last year that we started doing a survey of these zones. For this survey and design of engineering structures they invited PF “Grado”, while we were invited for the renovation and adaptation in the area of architecture and interior design.

Together we developed the renovation and adaptation project, and the working documents, some parts of it still being issued by us. And we also continue doing some survey. Some minor technological details are still being discussed but generally the project was raised to a whole new level. It’s a lot more elaborate this time.

zooming
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– In what order will you do the work? Do you have any specific plan for this?

– First, we will do a deconstruction of all these later additions and annexes. I am referring to the communal unit and the first floor. When that is done, we will be able to work with the communal unit in its entirety, and with the north part of the building as well. We want to do our work incrementally. I used to think that this was a wrong thing to do and that a house must be done as a whole. But a deep and detailed survey of the building brought me to a conclusion that it is better to start working with structures and engineering systems in a part of the building in order to field-test many of the methods that we included into the project and the working documents. Because to say that we did the architectural part of the project means to say nothing at all! We explained to the engineers just how the engineering systems in the building were wired because without thinking them out you cannot keep the structure of the building. And we consider keeping the structure of the building intact to be of paramount importance.

– Meaning, keeping the whole engineering structure intact is part of the project? And just what is the condition that these engineering systems are in?

– You cannot just go ahead and renovate the Narkomfin Building. In all the other constructivist buildings you can ultimately settle for as little as keeping the façade intact. But here is the thing – it is the inside structure that makes the Narkomfin Building what it is. It has so many subtleties to it that if you start making changes you will risk ruining it altogether. And our goal is to create a model case – or we will be faced with a prospect of losing the building.

Most of these engineering systems, of course, need to be replaced. For example, the house has inside steel water pipes that are rotten through. But our project provides for solutions that exactly correspond to historical routing. And we insist on that. This historical routing is far from simple. It is at odds with the modern construction rules and regulations.

Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


For example, the sewage in that building was done in this way: there were horizontal sections installed between the third and fourth floors inside the slab casts lying over precast joists.

– Why did they do it like this, anyway?

– There was a water riser that exactly followed the structure of the building. In the spots where the apartments of the “F” type gave way to larger increments of the “K” type it was necessary to switch the horizontal sections – simply because the lower apartments were bigger.

Actually, the inside structure is rather difficult to understand. Some renovators had this straightforward approach: “We’re going to go ahead and just make new risers, and that’s that!” And how exactly are you going to make them? At some places they will run right through the center of the apartment, which, of course, is not an option. You can only run them through the hollow-bodied blocks on the wall or in the same slab casts we spoke about.

Then I had to explain to the engineers that some of the columns of that ground floor were actually quite thick. You can see that in the old photos. Both indoor sanitation and water pipes ran through them. Nobody believed that this could be the case – they would roam around the building looking for the remains of the water pipes. They did everything short of wandering around with water search sticks.

– And what about roof water disposal then? How this was organized? 

– An internal downpipe. It’s a totally modernist narrative. It got clogged up, and nobody cared to unstop it. They made some sort of bypasses which would leak constantly, and the water would ultimately get inside the house. Today’s condition of the building is the logical result of how it was kept all these years.

– But what about the outside walls? They are made of reed pressboard, aren’t they? 

– Alright, let’s speak about the reed pressboard. I had this idea to entertain the people by leaving some fragments of the reed pressboard under glass inside the laundry unit for which we already have the work permit and have the working documents ready – after the renovation it will be turned into a cafe. As a matter of fact, reed pressboard is the precursor of rock wool. This building has many ideas in it that were to become modern construction technologies. And this is what makes it innovative – not just its architecture or organization of space. Reed pressboard served as the thermal insulant or a “heat retainer” between the cip beams of the side walls. Wherever they would come up close to the façade surface, these small spots were filled with it.

– Are these the only places where reed pressboard is to be found? 

– Yes, the only places. The house is built from concrete blocks that were cast directly on the construction site. These blocks were of two types. The first type was “Prokhorov blocks” – they looked very much like the ones that were used in the construction of Bauhaus. They were for the inside walls, and they only had two hollows. And it was these hollows that were used for laying the engineering lines.

"Peasant type" brickwork. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


The other type was called “peasant type”. They were used for the construction of the outside walls. The combination looked as follows: block – setting in broken stone as heat retainer – half-block – stucco – paint. This was the composition of the first three-layer wall. 

– And what are you planning to do with the walls? 

– This is one of the most controversial issues. At some places the walls are ruined, at some places they have been re-laid, and at some places they are in a great condition. Basically, all the damage has to do with water. For example, the east façade is a nightmare to look at. It has hanging flowerbeds upon it, and originally they had openings in them to let the water out. At some point – most likely, after the war – these openings were stopped. There weren’t any cache-pots inside – just soil and plants. So, when it rained, dirty water spilled over and leaked into the cracks between the stucco and the blocks. And if we take the walls of the communal unit or the west façade, they are in a great condition and don’t really need much renovating. But there are the north and south side walls, and these pieces of the east façade that will need to be partially redone.

Blocks designed by the engineer Prokhorov. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


zooming
East facade, preservation chart. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


As for the percentage of losses, we indicated it as a first approximation: only during the process, going from axis to axis and studying each one, we will be able to come up with a more exact figure. Still, though, we will relay the walls with the same blocks. We will make copies of these blocks, and we will recreate the brickwork. There were people who proposed to use breeze blocks or air-bricks but I made and showed them two hand drawings that clearly showed that this would be impossible for purely technical reasons, and not even because of some aesthetic or renovation considerations.

West facade, preservation chart. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– And why would that be impossible?

– Simply because every material has its size and measurements. Other measurements will change the inside space of the building, and, because it’s pretty compact on the inside, one thing will lead to another. Other materials have a different bulk density that these floors are simply not design to bear.

– Will the façade show in any way, in accordance with the Venice Charter, which part is the authentic one and which is the one that’s been renovated? Or is it still too early to talk about that?

– I like it very much how they renovated Neues Museum in Berlin in accordance with the charter. This is one of my favorite buildings. But when I look at it, what I see is rather a story of a bombed-down museum than a restored one. This memory of destroyed Berlin is an important part of the historical memory of the Germans. 

Do I think that in our case we need to indicate precisely that this square meter is original and this square meter has been renovated? Meaning – do we want our façade look like some kind of skin disease? This is a big question for me.

When I saw the renovated Bauhaus in Dessau, I didn’t notice anything of the kind. All the decoration was executed in a single style, and there was no old-and-new differentiation. On the Izvestia Building I refrained from showing where the old and where the new stained glass windows are. Otherwise the façade would look like some sort of kaleidoscope, and I wanted the building to produce an integral impression. This is a very serious question to me – choosing just which was I should go. I thought about it a lot, and I’m still thinking about it.

Diagram of water affecting the facade. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– You are saying a lot of things were researched for the first time. Did you discover anything entirely new? 

– Yes, there were things that became a revelation to me. For example, the stained glass window of the communal unit. I always thought that it was dark, the kind that I did on the Izvestia Building. But it turned out to be light-colored, almost white, both on the outside and on the inside. Oh, and, by the way, the building itself wasn’t white, the way they usually portray constructivist architecture. Its original color was different and we are sure to uncover it in the long run. We have already started this research, and we will keep on probing. In addition, we found horizontal “window wells” or “air shafts” that were very fashionable back in the early twentieth century. They are now piled up by some junk, but, of course, we will restore them. 

– And what will happen to the interiors?

– I have a dream. I want to convince the developer to sell apartments in this building as coming with their interior design. If not with the furniture then at least with the ready-made kitchens and bathrooms! It is important for me to show that not a single element in this building appeared by chance, that there was no “design for design’s sake” or “architecture for architecture’s sake”. Every detail mattered, and every detail had a very clear functional meaning. This holds true even for the wall paint.

All the repairs that were done there completely ruined the original decor. We have already taken 49 probes of wall paint from two apartments. Different walls were painted different colors. The “Sovremennaya Arkhitektura” (“Modern Architecture”) magazine published an article by Moisey Ginsburg about how you should go about painting walls; there were two sets of colors there – warm and cold, and then there was this Sheper’s color chart. Now we will analyze these colors and test them against this chart.

West facade, preservation chart. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


Project of recreation the color solutions of the interior designs. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– Does this mean that the shade of color effectively depended upon the cell type? 

– I don’t know. And nobody will tell you, either. We don’t have any information. We won’t find out anything if we don’t go around with a scalpel and a drill, and our technologist doesn’t research the probes in the laboratory. In the first two apartments that we researched we already ran into the primary and secondary layers of paint. I am very curious myself to find out if all the apartments were painted different colors or the same. Solving this task will be a real treat to me. I am ready to do each apartment individually only to find original colors.

Project of recreation the color solutions of the interior designs © Ginsburg Architects


What else? The developer wants us to make wooden floors. It’s understood that all the xylolite floors were replaced by practically all the tenants with wooden ones, for the exception of, perhaps, Milyutin. He laid carpets on this xylolite. Yes, am OK with making parquet floors but painting the walls original colors is a point of honor to me.

– And what about the Milyutin apartment? Have you already had a chance to get down to his “villa”? 

– Oh, come on, what kind of villa is that? I am ready to share with everyone how the Milyutin apartment came about. It is my firm belief that historical truth must not be lost. Let's start with the humble fact that the Milyutin apartment was not even in the original project. The only reason why it appeared later is because they did not have the money to install a draft ventilation system. But the air handling plant was already there on the roof. And Milyutin decided to make himself an apartment there. They had a quarrel with Ginsburg, and Milyutin said that he would design his apartment himself. He took a cell of Type K, tied it to this volume, and painted it blue. I was there still before they remodeled it and drew the Simpsons on the wall. Now they’ve been painted over but it looked atrocious in any case. We, of course, will recreate the original wall paint. Everything will be done the same way as it is in the other apartments. It’s no different than the other ones. This was basically a funny surreal story: a top statesman got himself a penthouse in the air handling plant next to four rooms of a worker dormitory. Well, he had a right to do as he pleased.

zooming
Left and center: color setting of Cell F. Right: color setting of Cell K / from the Moisey Ginsburg textbook "Zhilishche"


– Before the building changed the owner, one of the last scandals had to do with the fact that millwork was being carried out of the corridors. Was anything left there in the long run?

– A little, but, yes, there was. At least we have something to go on in terms of restoration. We will still try to renovate some small percentage of the windows. Still, we’ve got the drafts, and it’s clear how to do that.

– And what about the kitchen shutters that we read so much about in our textbooks – is there anything left of them?

– I have a growing suspicion that they were never there in the first place. 

– How can this be possible? And what about the draft that we all saw? 

– The drawing that you are referring to is from the “Zhilishche” (“Housing”) textbook, and I love it myself. But I never saw a single photograph of them. Not a single confirmation of their existence! I am not sure they were ultimately installed. When I visited that place as a kid, in spots, where, according to the Ginsburg project, kitchens were supposed to be, there were gas stoves in most of the apartments. In those apartments that I chanced to set my foot in, anyway! Meaning, the place of the “kitchen element” in Cells F was filled with something related to cooking. My dream is to make kitchenettes by the “Zhilishche” sketches, with that corrugated thing; but, of course, we won’t have gas stoves there.

Milyutin's apartment. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– What else is there in your restoration plans? 

– We want to lower the ground level. Back then, the level of the floor was about 30 centimeters lower than today’s ground level. This is like a restoration program within a restoration program – there have always been a lot of talk how important it was to uncover the first floor. But nobody bothered to analyze just how much must be done in order to uncover it. Meaning, the first challenge that we needed to solve was figure out what to do with the water because the building stands in the lowlands! Currently, water is leaking in from just about everywhere, including the parking lot before “Novinsky Passage”. We did a project for that, did the master plan, got the approvals from Administration for Service to the Diplomatic Corps and the American embassy. Our client got the technical specifications for plugging in to the surface water drain. Only this solution made this whole thing possible. Currently, by the way, we are in the stage of getting an approval from the local police. But, besides all this, there are engineering networks there that we will probably have to sink down even lower. This will also require obtaining technical specifications, extra work, and extra expenses.

zooming
Mini-kitchen in Cell F / from the Moisey Ginsburg textbook "Zhilishche"


Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


– Meaning, the project provides for organization of the territory?

– I want to make a single vehicle-free territory stretching from the American embassy to the park, with an underpass running beneath the building. It’s understood that historically there was earth there, and now it is concrete but I proposed to use the granite paving system that is already accepted in Moscow, just for the sake of uniformity.

– Are there any plans for making a museum in the Narkomfin building?

– We are discussing this question with the client. We are absolutely sure that it’s very important to turn one cell into a museum.
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Structures and elements of the building to be renovated. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Later additions and annexes. Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects
Project of restoration and adaptation of the cultural heritage site "Narkomfin Building" (2015-2017) © Ginsburg Architects


26 June 2017

author pht

Interviewed by:

Natalya Muradova, Julia Tarabarina
Translated by:
Anton Mizonov
comments powered by HyperComments
Headlines now
Park of Sentiments
The project of “Romantic Park Tuchkov Buyan”, which was developed by the consortium of Studio 44 and WEST 8, and has won an international competition, combines sculptural landscape design and wooden structures, variety of spatial features and an eventful agenda, designed for diverse audience, with a beautiful and complex passeist idea of a palace park, meant to evoke thoughts and feelings.
​Architecture as an Educational Tool
The concept of a charity school “Tochka Budushchego” (“Point of the Future”) in Irkutsk is based on cutting-edge educational programs, and is designed, among other things, for adapting orphaned children for independent life. An important role is played by the architecture of the building: its structure and different types of interconnected spaces.
​The Gallery Approach
In this article, we are covering the concept of a Central District Clinic for 240 patients, designed by Ginzburg Architects, which won at a competition organized by the Architects Union and the Healthcare Ministry.
Health Constructor
In this issue, we are publishing the concept of a standard clinic designed by UNK Project, which took second place in the competition organized by the Union of Architects of Russia in collaboration with the Healthcare Ministry.
From Foundation to Teaspoon
Based on the taste of their friendly clients, the architects Olga Budennaya and Roman Leonidov designed and built a house in the Moscow metropolitan area playing Art Nouveau. At the same time, they enriched the typology of a private house with modern functions of a garage loft and a children’s art studio.
Continuation and Development
The second “office” stage of Comcity, the most popular business park of the “New Moscow” area, continues the underground street of the already existing part of the complex, responding to its architectural identity.
​The Aperture Effect
For a housing complex built in the town of Pushkino in the Moscow metropolitan area, KPLN Architects designed facades that adjust the stream of light by using the wall geometry.
​A Comfortable City in Itself
The project that we are about to cover is seemingly impossible amidst human anthills, chaotically interspersed with old semi-neglected dachas. Meanwhile, the housing complex built on the Comcity business part does offer a comfortable environment of decent city: not excessively high-rise and moderately private as a version of the perfect modern urbanist solution.
Moving on the Edge
The housing complex “Litsa” (“Faces”) on Moscow’s Khodynka Field is one of the new grand-scale buildings that complement the construction around it. This particular building skillfully tackles the scale, subjugating it to the silhouette and the pattern; it also makes the most of the combination of a challenging land site and formidable square footage requirements, packing a whole number of features within one volume, so the house becomes an analogue of a city. And, to cap it all, it looks like a family that securely protects the children playing in the yard from... well, from everything, really.
Visual Stability Agent
A comparatively small house standing on the border of the Bolshevik Factory combines two diametrically opposite features: expensive materials and decorative character of Art Deco, and a wide-spaced, even somewhat brutal, facade grid that highlights a laminated attic.
The Faraday Cage
The project of the boutique apartment complex in the 1st Truzhenikov Lane is the architects’ attempt to squeeze a considerable volume into a tiny spot of land, at the same time making it look graceful and respectable. What came to their rescue was metal, stone, and curvilinear glass.
Color and Line
The new successful techniques developed by A.Len for designing a kindergarten under budget constraints: the mosaic of irregular windows and working with color.
The Union of Art and Technology
His interest for architecture of the 1930’s is pretty much the guiding star for Stepan Liphart. In his project of the “Amo” house on St. Petersburg’s Vasilyevsky Island, the architect based himself on Moscow Art Deco - aesthetically intricate and decorated in scratch-work technique. As a bonus, he developed the city block typology as an organic structure.
The Countdown
The project that Evgeniy Gerasimov and Partners developed for Moscow’s Leningrad Avenue: the tallest building in the company’s portfolio, continuing the tradition of Moscow’s Stalin architecture.
White Town
In the project that they developed for a southern region of Russia, OSA Architects use multilayered facades that create an image of seaside resort architecture, and, in the vein of the latest trends of today, mix up different social groups that the residents belong to.
​Just a Mirror for the Sun
The house that Sergey Skuratov designed in Nikolovorobinsky Alley is thought out down to the last detail. It adapts three historical facades, interprets a feeling of a complex city, is composed of many layers, and catches plenty of sunlight, from sunrises to sunsets. The architect himself believes that the main role of this house is creating a background for another nearby project of his, Art House in the Tessinsky Alley.
​Part of the Whole
On June 5, the winners of Moscow Architectural Award were announced. The winners list includes the project of a school in Troitsk for 2,100 students, with its own astronomy dome, IT testing ground, museum, and a greenhouse on the roof.
Pedagogical Architecture
Yet another project of a private school, in which Archimatika realizes the concept of aesthetic education and introduces a new tradition: combining Scandinavian and Soviet experience, turning to works of art, and implementing sustainable technologies.
​Rational Arrangement
In this article, we are examining a complex of buildings and interiors of the first stage of the project that has recently become extremely popular – the Kommunarka clinic.
​Parallel Universe
In the “Parallel House” residence that he designed in the Moscow metropolitan area, the architect Roman Leonidov created a dramatic sculptural composition from totally basic shapes – parallelepipeds, whose collision turned into an exciting show.
​Breakwater
In the Istra district of Moscow metropolitan area, the tandem of 4izmerenie and ARS-ST designed a sports complex – a monovolume that has the shape of a chamfered parallelepiped with a pointed “nose” like a ship’s bow.
​Stairway to Heaven
The project of a hotel in the settlement of Yantarny is an example of a new recreational complex typology, and a new format that unites the hotel, the business, and the cultural functions. All of this is complemented by 100% integration with nature.
​Cape of Good Hope
In this issue, we are showing all the seven projects that participated in a closed-door competition to create a concept for the headquarters of Gazprom Neft, as well as provide expert opinions on those projects.
​Waves of Sound
The conceptual design of a music school: proximity to an Alvar Aalto building, expressive organics, and an attempt to draw public attention to a “low-profile” competition.
​The Outer Space
Honoring the 300th anniversary of the Kuznetsk coal fields in 2021, a new passenger terminal of the Aleksey Leonov Airport in the city of Kemerovo will be built, designed by GK Spectrum and ASADOV Architectural Bureau.
​The Pivot of Narkomfin Building
Ginzburg Architects finished the restoration of the Narkomfin Building’s laundry unit – one of the most important elements of the famous monument of Soviet avant-garde architecture.
​Wicker Vitality
Next to the Dubrovka metro station, ADM has designed a Vitality housing complex with a polychrome mixture of Klinker brick on its ridged facades.
​Freedom Factory
The housing complex “Respublika” is so large that it can be arguably called a micro-town, yet, at the same time, it easily overcomes most of the problems that usually arise with mass housing construction. How could Archimatika achieve that? We are examining that on the example of the first stage of the complex.
​The Flowing Lines
The five houses of the “Svoboda” block belonging to the “Simvol” residential complex present a vivid example of all-rounded work performed by the architects on an integral fragment of the city, which became the embodiment of the approach to architecture that hitherto was not to be seen anywhere in Moscow: everything is subjected to the flow of lines – something like a stream, enhanced by the powerful pattern of the facades akin to “super-graphics”.
​A City by the Water
The concept of a large-scale housing development at the edge of Voronezh, near the city reservoir, or “the sea”, as it is locally called, uses the waterside height difference to create a sophisticated public space, paying a lot of attention to the distribution of masses that determine the look of the future complex if viewed from the opposite bank of the river.
A Journey to the Country of Art Deco
The “Little France” residential complex on the 20th line of the Vasilyevsky Island presents an interesting make-believe dialogue between its architect, Stepan Liphart, the architect of the New Hermitage, masters of the Silver Age, and Soviet Art Deco, about interesting professional topics, such as a house with a courtyard in the historical center of Saint Petersburg, and the balance between the wall and the stained glass in the architectonics of the facade. Here are the results of this make-believe conversation.
​A House in a Port
This housing complex on the Dvinskaya Street is the first case of modern architecture on the Gutuevsky Island. The architectural bureau “A-Len” thoroughly explores the context and creates a landmark for further transformations of this area of Saint Petersburg.
​Balance of Infill Development
Anatoly Stolyarchuk Architectural Studio is designing a house that inadvertently prevails over the surrounding buildings, yet still tries to peacefully coexist with the surrounding environment, taking it to a next level.
​The Precious Space
Evolution Design and T+T Architects reported about the completion of the interior design project of Sberbank headquarters on the Kutuzovsky Avenue. In the center of the atrium, hovers the “Diamant” meeting room; everything looks like a chest full of treasures, including the ones of a hi-tech kind.
​Big Little Victory
In a small-sized school located in Domodedovo in Moscow metropolitan area, ASADOV_ architects did a skillful job of tackling the constraints presented by the modest budget and strict spatial limitations – they designed sunlit classrooms, comfortable lounges, and even a multi-height atrium with an amphitheater, which became the center of school life.
​The Social Biology of Landscape
The list of new typologies of public spaces and public projects has been expanded yet again — thanks to Wowhaus. This time around, this company came up with a groundbreaking by Russian standards approach to creating a place where people and animals can communicate.
​Watched by the Angels from up Above
Held in the General Staff building of the Hermitage Museum, the anniversary exhibition of “Studio 44” is ambitious and diverse. The exhibition was designed to give a comprehensive showcase of the company’s architecture in a whole number of ways: through video, models, drawings, installations, and finally, through a real-life project, the Enfilade, which the exhibition opens up, intensifies, and makes work the way it was originally intended.
​A New Version of the Old City
The house at Malaya Ordynka, 19, fits in perfectly with the lineup of the street, looking even as if it straightened the street up a little, setting a new tone for it – a tone of texture, glitter, “sunny” warmth, and, at the same time, reserved balance of everything that makes the architecture of an expensive modern house.
Stepan Liphart: “Standing your ground is the right thing to do”
A descendant of German industrialists, “Jophan’s son”, and an architect, speaks about how studying architectural orders tempers one’s character, and how a team of just a few people can design grand-scale housing projects to be built in the center of Saint Petersburg. Also: Santa Claus appearing in a Stalin high-rise, an arch portal to the outer space, mannerism painting, and the palaces of Paris – all covered in an interview with Stepan Liphart.
​Honey and Copper
In the Moscow area, the architect Roman Leonidov designed the “Cool House” residence, very much in the spirit of Frank Lloyd Wright, spreading it parallel to the ground, and accentuating the horizontal lines in it. The color composition is based on juxtaposition of warm wood of a honey hue and cold copper blue.
​The Ring on the Saisara Lake
The building of the Philharmonic Hall and the Theater of Yakut Epos, standing on the shore of the sacred lake, is inscribed into an epic circle and contains three volumes, reminiscent of the traditional national housing. The roof is akin to the Alaas – a Yakut village standing around a lake. In spite of its rich conceptual agenda, the project remains volumetrically abstract, and keeps up a light form, making the most of its transparency, multiple layers, and reflections.
Architecture of Evanescence
On the Vernadskogo Avenue, next to the metro station, appeared a high-rise landmark that transformed the entire area: designed by UNK Project, the “Academic” business center uncovered, in the form of its architecture, the meanings of the local place names.
The Theater and Music Circles
The contest-winning ambitious grand-scale project of the main theater and concert complex of the Moscow area includes three auditoriums, a yard – a public area – a higher school of music, and a few hotels. It promises to become a high-profile center for the classical music festivals on a national scale.