A new version of the redevelopment project of the Ural Instrument Engineering Plant from T+T Architects
Written by: Lilya Aronova Translated by: Anton Mizonov
17 May 2016
Object
Architect:
Firm:
Approved by the customer and scheduled to be shortly implemented, the project of the multifunctional residential complex situated on the territory of the Ural Instrument Engineering Plant is significantly different from the concept that a year and a half ago allowed Т+Т Architects to win the contest organized by the administration of Ekaterinburg. At the same time, what remained unchanged were the basic ideological points - according to the judging panel, it was them that brought the victory to the Moscow architects: respect to the city-planning fabric of central part of Ekaterinburg, preserving the historical look of the façades, and the use of traditional Ural ornaments in the decoration. As far as the functional and the planning aspects of the project are concerned, the tables have turned here completely; furthermore, the original idea of reconstructing the plant's buildings got replaced with plans for new construction. Considering and reconciling all the new and old circumstances proved to be quite a challenge - according to the figurative expression of the chief architect of the project, Nikolai Makarov, the architects had to pass between lots of "scyllae and charybdes".
The announcement of the results of the contest was followed by a year-long hiatus during which, however, lots of things happened: an alternative concept of the reconstruction somehow appeared (with a facade in the classic Mauritania style); both projects were widely discussed by the professionals and by the city people; meanwhile, the customer drew up new documents and formed new specifications: it was decided that, instead of a hotel and apartments, this place would get residential buildings. In accordance with the city council's decision, Т+Т Architects revised their project which was later approved by the customer.
The Ural Instrument Engineering Plans is located in the very center of Ekaterinburg, in the middle between the embankment of the city pond and the Pushkin Street. The fact that the production facilities are gradually being removed from here stands to reason because this is in the interests of the city as well as of the company itself. The immediate surroundings of the plant include historical and cultural objects: the "Literary Quarter", the memorial house of Mamin-Sibiryak, churches, theaters, and museums; along the embankment line, the site neighbors on the classical estate of Zotov-Tarasov that is currently occupied by the governor's office, and the monumental neo-gothic "Sevastyanov" house, its elegant corner rotunda bring arguably the main architectural point of interest in Ekaterinburg. Introducing a new object into such a complex composition is a task that is challenging as it is but, to make things still more complicated, in the course of preparing the new version of the concept, it turned out that a considerable part of the main factory building that stretches along the Pervomayskaya Street and then makes a corner turn to the embankment must be kept absolutely intact: the bank that currently occupies this part of the building turned down not only the very idea of reconstruction but refused to do so much as remodel the building's façades. Thus, the main "scylla" consisted in the necessity to visually reconcile the new seven-story building with the historical four-story volume standing right next to it - all this in the "top responsibility" foreground.
"What we wanted to achieve was make our architecture correspond to the stipulated typology without contradicting its surroundings at the same time - Nikolai Makarov explains - This is why in the composition of the façade we maintain the basic lines that were there in the decoration of the factory buildings all along, and then add vertical fracturing to the horizontal kind - as a refrain of the colonnade that stays there on the facade of the bank building as the pilasters of the twin windows. The colonnade that adds visual lightness to the bulky rectangular volume and reflects beautifully in the water of the river also refers us to the river promenades of the epoch of classicism". Making up for the height difference between the old and the new buildings both facing the embankment was made possible by the dark stone that the authors propose to use in the top floors of the new building by contrast with the main part of the facade.
The intertwining horizontals and verticals form a multilayered structural grid: the larger vertical fracturing repeats the pattern of the factory façade while the finer details inside of it correspond to the scale of the neighboring historical building. Then what the architects do is take this canvas and "needlepoint" it with motifs drawn from the traditional local crafts - the wood construction and the Ural cross-stitch embroidery. The finely wrought monochrome pattern with a voluminous structure of the façade makes the perception of the building all but palpable - which is particularly important in view of the fact that the complex standing on the embankment has virtually no middle perspective: it can only be viewed either from a considerable distance - meaning, from the opposite bank of the pond - or from a really close range.
Т+Т Architects developed several versions of the façade backlighting, one of these versions making use of the decorative elements of transparent concrete and backlighting the ornaments from the inside in contre-jour. If this proposal is accepted, in the evenings the rosettes adorning the façades will display almost-real fire.
The project got an even more high-profile by the upcoming 300th anniversary of Ekaterinburg (the year of its foundation is considered to be 1723): the redevelopment of the plant's territory is to become one of the key construction points on the eve of the anniversary. The architects proposed the format of a "club house", still rather new to Ekaterinburg. The residential complex will consist of two buildings with a different number of floors - 7 and 13 - but the expected number of the apartments is not so large - 132 (what is peculiar, this number is split exactly in two between the two buildings despite their absolutely different configuration). The club format made the architects refrain from the idea of making the complex accessible to the general public which was, by the way, one of the contest stipulations; we will remind you at this point that it provided for dismantling part of the building on the embankment side and organizing a end-to-end passage running through the yard. This break, incidentally, became one of the most controversial points when the project was discussed. Currently, however, absolutely all the levels of the project, from master-planning to designing the interiors work towards creating an intimate homely "only for the family and friends" atmosphere. The interior design of the public zones was something that the architects paid a particularly respectful attention to: "Actually - says almost in full seriousness the company leader Sergey Trukhanov - it was all about the interior design all along anyway!" The main lobby of the club house, he says, must look like a drawing room in a private mansion where there is place for a sofa group, and a library, and a fireplace, and a bar counter (it is planned that the people who will live here and their guests will be served by the restaurant next door). The Intimacy and the graceful luxury - these two principles are observed in the interior design projects down to such tiny details as the design of the mailboxes. As for the inevitable reception desk, in this space it will have to play a role of a "great butler": it is actually there but it stands on the side keeping a low profile.
The entrance group is situated exactly at the spot where the factory's checkpoint used to be. The composition center of the façade though it is, it still puts forward no claims to play the dominant role, only sporting a graceful metallic marquee and a checkered paved "carpet" of tiles in front of the doors. Coming through the lobby - it was of particular importance to the architects making the lobby "walk-through", without steps or height differences - one can access the apartments of both buildings both on the outside, through the courtyard, and on the inside, through the covered gallery that stretches along the entire perimeter of the seven-story building and further connecting the two buildings via a single-story stylobate in which the architects are planning to organize a swimming pool. Due to the fact that the gallery runs along the inside façade that has the stairway and elevator units attached to it, the authors of the project had quite a hard time figuring out how to organize the space as efficiently as possible. As a result, the stairways receded into the depth of the building, the elevators became panoramic ones, and each of the four hallways got a fully-fledged atrium.
The building of the swimming pool that joins the two residential units is yet another point of pride of the architects. In spite of its clearly utilitarian role, it must become the embodiment of the club ideology that the project is based upon. Here is the thing - the pedestrian gallery is only separated from the swimming pool by a glass wall - which means that on the way home people living in Unit B will be able to wave hello to their neighbors splashing in the water, while the latter, thanks to the glass façades and the turnaround pylons, will be able to watch what is going on in the courtyard. As for the outward appearance of this structure, the architects deliberately designed it as laconic as possible - so as not to divert the viewer's attention from the interaction of the two residential units that deserves special attention.
Unlike Unit A that embraces the block along its perimeter, Unit B is in fact a thirteen-floor tower. It is clear that with such height it will inevitably "tower" above the embankment skyline but the architects had no choice anyway: the useful square footage is still what matters, and the complex still will not become the tallest building in the cityscape - the panorama of the city pond has buildings in it that are still taller anyway. And as for the design of the façade, that same structural grid that is there at the basis of the façades of the outside part behaves in a much freer way: it is not hindered here by the disciplining influence of the embankment's historical context. This is why the rhythm of the vertical fragments starts skipping beats, the vertical surfaces turn with their blunt angles, and generally the building produces an impression of a more modern one but still closely connected, well, not to its "twin" but still to its brother. An observer that finds himself inside the courtyard and has an opportunity to see the two buildings at once will be sure to appreciate this gradient transition from the classical reserved manner to the utmost architectural freedom.
Because there is a considerable four-meter relief drop inside the block, the yard is divided into two major parts: the upper and the lower one. Down below, there is an underground parking garage that is a level and a half thanks to the height difference. The role of the bearing wall for the upper yard is again played by the building of the swimming pool. On the slope, an unusual fountain is designed - the water issues directly from under the wall of the house forming a little brook flowing into a small reservoir in which the pylons of the pool reflect. The center of the composition of the upper yard is the circular bench/flowerbed, the playground being neatly inscribed into the curve of the pedestrian trails of the lower part. Designing the yard, the architects had to take into consideration not only the fact of the bank building being there but also a few other structures adjoining the site from the side of the Pushkin Street. The role of the small but toothy "charibdes" was played by the Pension Foundation and the memorial house of Mamin-Sibiryak, two organizations that, in addition to their two buildings, possessed some extra premises on the territory of the plant. The authors of the project not only had to find a way around these buildings but also make up for the lost square meters; luckily, the solution left everyone happy. Which, ultimately, was the goal, anyway.
Gold in the Sands
A new office for a transcontinental company specializing in resource extraction and processing has opened in Dubai. Designed by T+T Architects, masters of creating spaces that are contemporary, diverse, flexible, and original, this project exemplifies their expertise. On the executive floor, a massive brass-clad partition dominates, while layered textures of compressed earth create a contextually resonant backdrop.
Layers and Levels of Flight
This project goes way back – Reserve Union won this architectural competition at the end of 2011, and the building was completed in 2018, so it’s practically “archival”. However, despite being relatively unknown, the building can hardly be considered “dated” and remains a prime example of architectural expression, particularly in the headquarters genre. And it’s especially fitting for an aviation company office. In some ways, it resembles the Aeroflot headquarters at Sheremetyevo but with its own unique identity, following the signature style of Vladimir Plotkin. In this article, we take an in-depth look at the United Aircraft Corporation (UAC) headquarters in the Moscow agglomeration town of Zhukovsky, supplemented by recent photographs from Alexey Naroditsky – a shoot that became only recently possible due to the fact that improvements were finally made in the surrounding area.
Light and Shadow
In this article, we delve into the architectural design of the “Chaika” house by DNK ag architects, which was recently completed in 2023 as part of the collection of signature designs at ZILArt. As is well-known, all the buildings in this complex follow a design code, yet each one is distinct. This particular building stands out not only for its whiteness and minimalism but also for the refined use of a limited number of techniques that, together, create what can confidently be called synergy.
Casus Novae
A master plan was developed for a large residential area with a name of “DNS City”, but now that its implementation began, the plan has been arbitrarily reformatted and replaced with something that, while similar on the surface, is actually quite different. This is not the first time such a thing happens, but it’s always frustrating. With permission from the author, we are sharing Maria Elkina’s post.
Treasure Hunting
The GAFA bureau, in collaboration with Tegola and Arkhitail, organized an expedition to the island of Kilpola in Karelia as part of Moskomarkhitektura’s “Open City” festival. There, amidst moss and rocks, the students sought answers to questions like: what is the sacred, where does it dwell, and what sustains it? Assisting the participants in this quest were landscape engineer Evgeny Levin, artist Nicholas Roerich, a moose, and the lack of cellular connection. Here’s how the story unfolded.
Depths of the Earth, Streams of Water
In the Malaya Okhta district, the Akzent building, designed by Stepan Liphart, was constructed. It follows a classic tripartite structure, yet it’s what you might call “hand-drawn”: each façade is unique in its form and details, some of which aren’t immediately noticeable. In this article, we explore the context and, together with the architect, delve into how the form was developed.
Fir Tree Dynamics
The “Airports of Region” holding is planning to build an airport in Karachay-Cherkessia, aiming to make the Arkhyz and Dombay resorts more accessible to travelers. The project that won in an invitation-only competition, submitted by Sergey Nikeshkin’s KPLN, blends natural imagery inspired by the shape of a conifer seed, open-air waiting spaces, majestic large trees, and a green roof elevated on needle-like columns. The result is both nature-inspired and WOW.
A Brick Shell
In the process of designing a clubhouse situated among pine trees in a prestigious suburban area near Moscow, the architectural firm “A.Len” did the façade design part. The combination of different types of brick and masonry correlates with the volumetric and plastique solutions, further enhanced by the inclusion of wood-painted fragments and metal “glazing”.
Word Forms
ATRIUM architects love ambitious challenges, and for the firm’s thirtieth anniversary, they boldly play a game of words with an exhibition that dives deep into a self-created vocabulary. They immerse their projects – especially art installations – into this glossary, as if plunging into a current of their own. You feel as if you’re flowing through the veins of pure art, immersed in a universe of vertical cities, educational spaces – of which the architects are true masters – and the cultural codes of various locations. But what truly captivates is the bold statement that Vera Butko and Anton Nadtochy make, both through their work and this exhibition: architecture, above all, is art – the art of working with form and space.
Flexibility and Acuteness of Modernity
Luxurious, fluid, large “kokoshniks” and spiral barrel columns, as if made from colorful chewing gum: there seem to be no other mansion like this in Moscow, designed in the “Neo-Russian-Modern” style. And the “Teremok” on Malaya Kaluzhskaya, previously somewhat obscure, has “come alive with new colors” and gained visibility after its restoration for the office of the “architectural ecosystem” as the architects love to call themselves. It’s evident that Julius Borisov and the architects at UNK put their hearts into finding this new office and bringing it up to date. Let’s delve into the paradoxes of this mansion’s history and its plasticity. Spoiler: two versions of modernity meet here, both balancing on the razor’s edge of “what’s current”.
Yuri Vissarionov: “A modular house does not belong to the land”
It belongs to space, or to the air... It turns out that 3D printing is more effective when combined with a modular approach: the house is built in a workshop and then adapted to the site, including on uneven terrain. Yuri Vissarionov shares his latest experience in designing tourist complexes, both in central Russia and in the south. These include houseboats, homes printed from lightweight concrete using a 3D printer, and, of course, frame houses.
Moscow’s First
“The quality of education largely depends on the quality of the educational environment”. This principle of the last decade has been realized by Sergey Skuratov in the project for the First Moscow Gymnasium on Rostovskaya Embankment in the Khamovniki district. The building seamlessly integrates into the complex urban landscape, responding both to the pedestrian flow of the city and the quiet alleyways. It skillfully takes advantage of the height differences and aligns with modern trends in educational space design. Let’s take a closer look.
Looking at the Water
The site of Villa Sonata stretches from the road to the water’s edge, offering its own shoreline, pier, and a picturesque river panorama. To reveal these sweeping views, Roman Leonidov “cut” the façade diagonally parallel to the river, thus getting two main axes for the house and, consequently, “two heads”. The internal core – two double-height spaces, a living room and a conservatory, with a “bridge” above them – makes the house both “transparent” and filled with light.
The White Wing
Well, it’s not exactly white. It’s more of a beige, white-stone structure that plays with the color of limestone – smoother surfaces are lighter, while rougher ones are darker. This wing unites various elements: it absorbs and interprets the surrounding themes. It responds to everything, yet maintains a cohesive expression – a challenging task! – while also incorporating recognizable features of its own, such as the dynamic cuts at the bottom, top, and middle.
Urban Dunes
The XSA Ramps team designed and built a three-part sports hub for a park in Rostov-on-Don, welcoming people of all ages and fitness levels. The skate plaza, pump track, and playground are all meticulously crafted with details that attract a diverse range of visitors. The technical execution of the shapes and slopes transforms this space into a kind of sculptural composition.
Proportional Growth
The project for the fourth phase of the ÁLIA residential area has been announced. The buildings are situated on an elongated plot – almost a “ray” that shoots out from the center of the area towards the river. Their layout reflects both a response to Moscow’s architectural preferences over the past 15 years, shifting “from blocks to towers”, and an interpretation of the neighboring business park designed by SOM. Additionally, the best apartments here are not located at the very top but closer to the middle, forming a glowing “waistline”.
The “Staircase” Building
In designing the “Details” residential complex in New Moscow, Rais Baishev spiced up the now-popular Moscow theme of a “courtyard” building with an idea drawn from the surrealist drawings by Maurits Escher. He envisioned the stepped silhouettes and descending slopes as a metaphysical mega-staircase, creating a key void within the courtyard that gave the project an internal “spine”. This concept is felt both in the building’s silhouette and on its façades.
Projection of the Quarter
No one doubted that the building that Vladimir Plotkin designed as part of the “Garden Quarters” would be the most modernist of all. And it turned out just that way: while adhering to the common design code, the building successfully combines brick and white stone, rhythmically responding to the neighboring building designed by Ostozhenka, yet tactfully and persistently making a few statements of its own. This includes the projection of the ideal urban development composition “14–9–6”, which can be found right next door, mathematical calculations, including those for various types of terraces (and perhaps the only reminder of the Soviet past of the Kauchuk rubber factory!), and the white “cross-stitch” pattern of the façade grid.
Domus Aurea
In this issue, we examine the “Tessinsky-1” house, designed by Sergey Skuratov and completed in 2023. Located in the middle of the Serebryanicheskaya Embankment district, at the intersection of its main streets, this house assumes a sort of “nodal” role: it not only responds to everything around it and preserves many memories of the former EMA factory within itself, but it weaves all this into a newly directed pattern, reconciling bright “gold” and dark-colored brick, largely with the help of the new, modern-yet-archaic Columba brick, which, come to think about it, is the most precious element here.
The Chimney of Nikola-Lenivets
In this issue, we are examining the “Obelisk House” designed by KATARSIS and built for the Arkhstoyanie 2023 festival. However, it was only finished later on, and this is why we are examining it now. It seems to us that after the “Obelisk House” appeared in Nikola-Lenivets, a dialogue and a few inner connections appeared between the temporary structures built here. These houses no longer look like “accidental neighbors”, more of which below.
Periscope by the Bay
The jury awarded the second place in the competition for a public and cultural center in Petropavlovsk-Kamchatsky to the companies GORA (“Mountain”) and M4. In the consortium’s proposal, the building resembles a sperm whale with a calf swimming next to it or a periscope, whose lenses capture the most spectacular views from the surrounding landscape.
From Arcs to Dolmens
While working on the competition project for Petropavlovsk-Kamchatsky, ASADOV Architects prioritized the value of the natural and urban environment, aiming to preserve the balance of the location while minimizing the resemblance of the volume that they designed to a “traditional building”. The task was challenging, and the architects created three versions, one of which having been developed after the competition, where their main proposal took third place. However, the point of interest here is not the competition result but the continuity of creative thinking.
Hide and Seek
The ID Moskovskiy house, designed by Stepan Liphart in St. Petersburg, in the courtyards near Moskovskiy Avenue beyond the Obvodny Canal and recently completed, is notable for several reasons. Firstly, it has been realized with considerable accuracy, which is particularly significant as this is the first building where the architect was responsible not only for the facades but also for the layouts, allowing for better integration between the two. On the other hand, this building is interesting as an example of the “germination” of new architecture in the city: it draws on the best examples from the neighborhood and becomes an improved and developed sum of ideas found by the architect in the surrounding context.
The Big Twelve
Yesterday, the winners of the Moscow Mayor’s Architecture Award were announced and honored. Let’s take a look at what was awarded and, in some cases, even critique this esteemed award. After all, there is always room for improvement, right?
Above the Golden Horn
The residential complex “Philosophy” designed by T+T architects in Vladivostok, is one of the new projects in the “Golubinaya Pad” area, changing its development philosophy (pun intended) from single houses to a comprehensive approach. The buildings are organized along public streets, varying in height and format, with one house even executed in gallery typology, featuring a cantilever leaning on an art object.
Nuanced Alternative
How can you rhyme a square and space? Easily! But to do so, you need to rhyme everything you can possibly think of: weave everything together, like in a tensegrity structure, and find your own optics too. The new exhibition at GES-2 does just that, offering its visitor a new perspective on the history of art spanning 150 years, infused with the hope for endless multiplicity of worlds and art histories. Read on to see how this is achieved and how the exhibition design by Evgeny Ace contributes to it.
Blinds for Ice
An ice arena has been constructed in Domodedovo based on a project by Yuri Vissarionov Architects. To prevent the long façade, a technical requirement for winter sports facilities, from appearing monotonous, the architects proposed the use of suspended structures with multidirectional slats. This design protects the ice from direct sunlight while giving the wall texture and detail.
Frozen Magma
A competition for the creation of a public and cultural center was held in Petropavlovsk-Kamchatsky. Three architectural companies made it to the final, and we consider it important to share about the work of each. Let’s start with the winner – the consortium led by Wowhaus.
Campus within a Day
In this article, we talk about what the participants of Genplan Institute of Moscow’s hackathon were doing at the MosComArchitecture booth at the “ArchMoscow” exhibition. We also discuss who won the prize and why, and what can be done with the territory of a small university on the outskirts of Moscow.
Vertical Civilization
Genpro considered the development of the vertical city concept and made it the theme of their pavilion at the “ArchMoscow” exhibition.