По-русски

Harmonization of Intentions

We met and talked with the chief architect of Genplan Institute of Moscow Grigory Mustafin and the chief architect of Yuzhno-Sakhalinsk Maxim Efanov – about how the master plan of the city is formed. The key to success: gathering data, digital simulation, working with the city people, thinking infrastructure, and presentation.

09 October 2023
Interview
mainImg
Archi.ru 
How long did you work on the master plan of Yuzhno-Sakhalinsk? 

Grigory Mustafin,
Chief architect of Genplan Institute of Moscow:
We started in 2020, in July 2022 we made revisions based on the results of public hearings; and in September 2022 the document was approved. In parallel, in April 2022, we started working with the master plan for the first agglomeration belt. We combined and synchronized all the intentions for the development of Yuzhno-Sakhalinsk, and as a result, the city received a comprehensive package of documentation for all its needs: urban planning, financing, and presentation of itself at the federal level.

The master plan was preceded by a spatial development strategy development stage, for which we engaged international companies and conducted comprehensive sociological research.

Long-term strategic projects
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Maxim Efanov,
Chief Architect of Yuzhno-Sakhalinsk:
In the spatial strategy, we tried out several projects: for example, we started to form land plots for the production of liquefied natural gas. We passed this stage within the framework of the Skolkovo program for training management personnel for the 100 largest Russian cities: we voiced our ideas in presentations and received feedback. And in the process of approving the master plan, we realized that we had additional local tasks and made adjustments. In a word, it is a living and breathing document. Quite large functional zoning gives us a lot of flexibility, and the land use and development rules allow us to fine-tune the details.

Grigory Mustafin: If we trace how the requirements for the development of master plans from the 10th order were implemented, we will see that the developers of master plans are gradually moving from a full classifier of functional zoning of 30 names to increasingly larger zones, which include flexible levers to respond to changing external settings.

  • zooming
    1 / 3
    Agricultural land
    Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning
  • zooming
    2 / 3
    Linear industrial park
    Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning
  • zooming
    3 / 3
    The Energy Valley
    Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Is this the reason that Yuzhno-Sakhalinsk needed a new master plan so urgently? The previous one was only adopted in 2012?

Maxim Efanov: The master plan is usually adopted for 20 years, but over this time everything changes, right down to urban planning legislation. In the previous master plan there were no investment projects that we are currently implementing. And in order to form land plots for them, there must be an appropriate type of permitted use. And even if a land plot was formed, we have no infrastructure for it: engineering networks, highways. Simply repainting zones – that’s not how it works. Every three years the master plan definitely needs to be adjusted. As we have already said, it is a living document.

Grigory Mustafin: The new Master Plan has been prepared in accordance with the new legislative requirements, including those for design. The socio-economic development of Yuzhno-Sakhalinsk has also had a significant impact on it. We have updated several issues: for example, the previous master plan included the areas of the Ministry of Defense and forestry, and the road was routed through a few “forbidden” areas. We analyzed every conflict of interests and proposed alternatives. A big block of work in the creation of the master plan is the harmonization of intentions and clarification of priorities of the city development.

How do you monitor the actual implementation of the master plan?

Maxim Efanov: A special division of the Department of Architecture and Urban Planning together with the Department of Economic Development is in charge of monitoring urban planning documentation. Having approved the draft master plan, we make sure that the development moves in the vector it was designed for. This is a long-term day-to-day work: to select a land plot, to analyze vacant territories and put them up for auction, to help the land use department to form tender documentation, to determine the parameters of the territory.

Which solutions of the master plan for Yuzhno-Sakhalinsk are already being implemented, and which are in the pipeline? How do you establish your implementation priorities?

Maxim Efanov: Yuzhno-Sakhalinsk now has an overland metro. The previous master plan envisioned taking the railroad outside the city center, but now the approach to this issue has been revised: the railroad has become the basis for the development of the surface metro. Rail buses are used as high-speed public transportation that does not stand in traffic jams and is not afraid of snow drifts and snowstorms.

The entire city transportation network is now formed on the basis of the existing railroad: several interchange hubs have already been opened, and together with Russian Railways we have changed the schedule of freight traffic so as not to interfere with the movement of public transport. Demand for railroads has been growing by multiples every year since the launch. The bet has played out.
 
Grigory Mustafin: To support this story, we have put into perspective the development of the territory around the surface metro stations in order to capitalize this infrastructure. Renovation of the industrial zone with the creation of a new urban center, development of industrial technoparks, agro-parks, new residential areas are “tied” to the railroad. The alternation of residential areas and economic clusters makes it possible to move towards the concept of a “15-minute city”.

Creation of places of labor application
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Housing construction
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Maxim Efanov: It is also worth mentioning that until 2018, Yuzhno-Sakhalinsk had only a narrow-gauge railroad; now it has been “revamped” but not electrified. The rail buses are modern, comfortable, but they run on a diesel engine. Together with PJSC RusHydro, we have launched a program to switch the rail bus to hydrogen fuel, and the same is expected for the rest of the transport, which is now gasified at the expense of the regional subsidy. We are striving for carbon neutrality.

Grigory Mustafin: Our colleagues have chosen a very productive approach: first they invested in transportation, then they developed the territory itself. It is very rare for our cities to have such a well-organized urban planning activity.

What other interesting things can you mention?

Maxim Efanov:  The master plan of the northern industrial zone is ready, this year we plan to do a lottery for the “integrated land development” program. The “UYUN” and “Horizon” micro-districts are under construction, the “Field of Miracles” micro-district has been designed, the first stage of construction of a technopark, an agro-park, an airstrip, a western bypass road of regional significance, a scientific and educational center, a campus for 1500 students has begun. All this was from the very start included in the spatial development strategy and master plan.

These adjustments to the master plan – do they come mostly from “above” or from “below”?

Maxim Efanov: The municipality, of course, understands where housing should be developed and where industry should be developed. But there are nuances that residents know much better. For example, we discussed in detail with the citizens four options for the alignment of the western bypass and the so-called eastern bypass street: we met, discussed the pros and cons, made decisions at the management level and adjusted the master plan in the way we agreed with the residents. Thus, we removed a large block of tension. The number of appeals about violation of citizens’ rights in urban documentation has significantly decreased.

Opinion poll in Yuzhno-Sakhalinsk
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Grigory Mustafin: This was an initiative of the client and us as a contractor – the legislation provides for interaction with residents only at the very last stages during public hearings. Our colleagues in the terms of reference for the development of documentation included a separate stage for this: telephone and internet surveys were conducted, a platform with a map where you could leave an idea worked, seminars about transportation and the natural framework were held. We literally sat in circles and drew schemes of possible city development. Then we would come separately and show them – this is what we have fixed, what goes into the concept. And then iterations. There were projects in our practice, where less work was done, and it was felt at public hearings. We also met individually with businesses and investors. It would be correct to scale this experience to other cities in our country.

Map of proposals based on the results of work with residents of Yuzhno-Sakhalinsk
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


The Genplan Institute of Moscow has developed a “System of Complex Indicators of Urban Environment Assessment” – how does it help in creating a master plan?

Grigory Mustafin: There is a certain algorithm in the development of any territorial and strategic planning document. Everything starts with data collection work, which in fact never stops: even by the time the master pan is approved, we continue to receive various data from executive authorities, residents, and other sources.

Pre-project analytics
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning

 
Your data is information, but information does not automantically equal meaning. Using complex algorithms, we verify the data and turn them into a basis for creating a project solution: we identify problems, potentials, and drivers of territory development. That is, we turn facts into value judgments. Further we do not say: “here is the final correct solution for the development of the city”. Instead, we consider several scenarios: if we do nothing, if we emphasize agglomeration development, or if we invest all investments in the city center. We have made five such scenarios for Yuzhno-Sakhalinsk.

Options of preliminary development scenarios for Yuzhno-Sakhalinsk
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning


Further on, we use this information for modeling apparatus and apply tools that would help to characterize the scenario from an unexpected side, to show the pitfalls. In this process, we try to identify the maximum number of objective pros and cons. And after that we choose either the best scenario or combine the “hits” from all variants.

Analytical models as a tool for assessing development options
Copyright: © Image provided by Yuzhno-Sakhalinsk Department of Architecture and Urban Planning

 
After the selection of the scenario follows nuanced work and refinement. This stage is also accompanied by modeling: we check how the changes affect the load of infrastructure, the provision of residents with certain resources. This tool is also convenient for approvals.
 
Is the algorithm the same for working with all cities?

Grigory Mustafin: There are nuances. The data is organized differently, the assessment tools differ: somewhere it is related to landscape characteristics, somewhere – to historical and cultural heritage. We try to transform the template in such a way that it is customized to the uniqueness of the city. For example, in Sevastopol, an important factor influencing all decisions is the relief: the city territory is located on terraces, beams, ridges, and you have to take into account the view of the sea – all this affects functional zoning.
 
In the case of Yuzhno-Sakhalinsk, especially in the case of the master plan, a lot of attention is paid to the presentation of the work – videos, layouts, infographics, discussion at the Eastern Economic Forum. How important is this part of the work?

Maxim Efanov: The presentation made by the Institute of General Plan together with IND architects on the first belt of the Yuzhno-Sakhalinsk agglomeration is beyond praise. This is exactly the kind of presentation that is needed to bring numbers, maps, and schemes to the attention of managers and residents, and to show and justify that your project is successful.
 
Grigory Mustafin: It should be remembered that the master plan for the Yuzhno-Sakhalinsk agglomeration and other Far Eastern cities was prepared at a different level, by order of the President. And this is unprecedented: it is the first time in the history of master planning that such a large-scale initiative from the federal government has appeared. The level of involvement of regional governments and federal executive bodies was very high. When we were developing the master plan, we regularly prepared materials for private presentations and discussed them separately with Maxim Oreshkin and Yuri Trutnev. At one point, the jury looked at 10 master plans at once. Then the master plans were reviewed by the President and currently some of them, including Yuzhno-Sakhalinsk, have already been approved and are receiving support.

We wanted to showcase the region to the best advantage. We made a 15-minute video with 170 slides, which covered absolutely everything – initiatives, agreements, strategic projects, drivers of economic development. We also made a shorter video with infographics, 3D visualizations, in which we translated the figures understandable to specialists into human language. Then we presented them at the Eastern Economic Forum.
 
In May 2023, the master plan was presented to the president and approved. After that, special decrees were issued to support infrastructure projects.



Let’s summarize: what is the formula for a viable master plan?
 
Grigory Mustafin: The first thing is interaction with residents, starting from the stage of forming the first conceptual decisions.
 
The second is an emphasis on infrastructure development: instead of building a residential area in a field, it is necessary to develop high-speed transportation and focus priority projects on it, taking into account the strategic goals.
 
The third is to alternate residential areas with economic clusters. In Yuzhno-Sakhalinsk, this is, for example, an agro-park, which affects the improvement of the island’s food security, the external economic framework, and the possibility of exporting to other regions.
 
These three things mean a high quality master plan for any city, regardless of its geographic location.

09 October 2023

Headlines now
The Golden Crown
The concept for a dental clinic in Yekaterinburg, developed by CNTR Studio, revolves around the idea of a “mouth full of gold”: pristine white porcelain stoneware walls are complemented by matte brass details. To avoid an overly literal interpretation, the architects focused on the building’s proportions, skillfully navigating between sunlight requirements and fire safety regulations.
Flexibility and Integration
Not long ago, we covered the project for the fourth phase of the ÁLIA residential complex, designed by APEX. Now, we’ve been shown different fence concepts they developed to enclose the complex’s private courtyards, incorporating a variety of public functions. We believe that the sheer fact that the complex’s architects were involved in such a detail as fencing speaks volumes.
A Step Forward
The HIDE residential complex represents a major milestone for ADM architects and their leaders Andrey Romanov and Ekaterina Kuznetsova in their quest for a fresh high-rise aesthetic – one that is flexible and layered, capable of bringing vibrancy to mass and silhouette while shaping form. Over recent years, this approach has become ADM’s “signature style”, with the golden HIDE tower playing a pivotal role in its evolution. Here, we delve into the project’s story, explore the details of the complex’s design, and uncover its core essence.
Gold in the Sands
A new office for a transcontinental company specializing in resource extraction and processing has opened in Dubai. Designed by T+T Architects, masters of creating spaces that are contemporary, diverse, flexible, and original, this project exemplifies their expertise. On the executive floor, a massive brass-clad partition dominates, while layered textures of compressed earth create a contextually resonant backdrop.
Layers and Levels of Flight
This project goes way back – Reserve Union won this architectural competition at the end of 2011, and the building was completed in 2018, so it’s practically “archival”. However, despite being relatively unknown, the building can hardly be considered “dated” and remains a prime example of architectural expression, particularly in the headquarters genre. And it’s especially fitting for an aviation company office. In some ways, it resembles the Aeroflot headquarters at Sheremetyevo but with its own unique identity, following the signature style of Vladimir Plotkin. In this article, we take an in-depth look at the United Aircraft Corporation (UAC) headquarters in the Moscow agglomeration town of Zhukovsky, supplemented by recent photographs from Alexey Naroditsky – a shoot that became only recently possible due to the fact that improvements were finally made in the surrounding area.
Light and Shadow
In this article, we delve into the architectural design of the “Chaika” house by DNK ag architects, which was recently completed in 2023 as part of the collection of signature designs at ZILArt. As is well-known, all the buildings in this complex follow a design code, yet each one is distinct. This particular building stands out not only for its whiteness and minimalism but also for the refined use of a limited number of techniques that, together, create what can confidently be called synergy.
Casus Novae
A master plan was developed for a large residential area with a name of “DNS City”, but now that its implementation began, the plan has been arbitrarily reformatted and replaced with something that, while similar on the surface, is actually quite different. This is not the first time such a thing happens, but it’s always frustrating. With permission from the author, we are sharing Maria Elkina’s post.
Treasure Hunting
The GAFA bureau, in collaboration with Tegola and Arkhitail, organized an expedition to the island of Kilpola in Karelia as part of Moskomarkhitektura’s “Open City” festival. There, amidst moss and rocks, the students sought answers to questions like: what is the sacred, where does it dwell, and what sustains it? Assisting the participants in this quest were landscape engineer Evgeny Levin, artist Nicholas Roerich, a moose, and the lack of cellular connection. Here’s how the story unfolded.
Depths of the Earth, Streams of Water
In the Malaya Okhta district, the Akzent building, designed by Stepan Liphart, was constructed. It follows a classic tripartite structure, yet it’s what you might call “hand-drawn”: each façade is unique in its form and details, some of which aren’t immediately noticeable. In this article, we explore the context and, together with the architect, delve into how the form was developed.
Fir Tree Dynamics
The “Airports of Region” holding is planning to build an airport in Karachay-Cherkessia, aiming to make the Arkhyz and Dombay resorts more accessible to travelers. The project that won in an invitation-only competition, submitted by Sergey Nikeshkin’s KPLN, blends natural imagery inspired by the shape of a conifer seed, open-air waiting spaces, majestic large trees, and a green roof elevated on needle-like columns. The result is both nature-inspired and WOW.
​A Brick Shell
In the process of designing a clubhouse situated among pine trees in a prestigious suburban area near Moscow, the architectural firm “A.Len” did the façade design part. The combination of different types of brick and masonry correlates with the volumetric and plastique solutions, further enhanced by the inclusion of wood-painted fragments and metal “glazing”.
Word Forms
ATRIUM architects love ambitious challenges, and for the firm’s thirtieth anniversary, they boldly play a game of words with an exhibition that dives deep into a self-created vocabulary. They immerse their projects – especially art installations – into this glossary, as if plunging into a current of their own. You feel as if you’re flowing through the veins of pure art, immersed in a universe of vertical cities, educational spaces – of which the architects are true masters – and the cultural codes of various locations. But what truly captivates is the bold statement that Vera Butko and Anton Nadtochy make, both through their work and this exhibition: architecture, above all, is art – the art of working with form and space.
Flexibility and Acuteness of Modernity
Luxurious, fluid, large “kokoshniks” and spiral barrel columns, as if made from colorful chewing gum: there seem to be no other mansion like this in Moscow, designed in the “Neo-Russian-Modern” style. And the “Teremok” on Malaya Kaluzhskaya, previously somewhat obscure, has “come alive with new colors” and gained visibility after its restoration for the office of the “architectural ecosystem” as the architects love to call themselves. It’s evident that Julius Borisov and the architects at UNK put their hearts into finding this new office and bringing it up to date. Let’s delve into the paradoxes of this mansion’s history and its plasticity. Spoiler: two versions of modernity meet here, both balancing on the razor’s edge of “what’s current”.
Yuri Vissarionov: “A modular house does not belong to the land”
It belongs to space, or to the air... It turns out that 3D printing is more effective when combined with a modular approach: the house is built in a workshop and then adapted to the site, including on uneven terrain. Yuri Vissarionov shares his latest experience in designing tourist complexes, both in central Russia and in the south. These include houseboats, homes printed from lightweight concrete using a 3D printer, and, of course, frame houses.
​Moscow’s First
“The quality of education largely depends on the quality of the educational environment”. This principle of the last decade has been realized by Sergey Skuratov in the project for the First Moscow Gymnasium on Rostovskaya Embankment in the Khamovniki district. The building seamlessly integrates into the complex urban landscape, responding both to the pedestrian flow of the city and the quiet alleyways. It skillfully takes advantage of the height differences and aligns with modern trends in educational space design. Let’s take a closer look.
Looking at the Water
The site of Villa Sonata stretches from the road to the water’s edge, offering its own shoreline, pier, and a picturesque river panorama. To reveal these sweeping views, Roman Leonidov “cut” the façade diagonally parallel to the river, thus getting two main axes for the house and, consequently, “two heads”. The internal core – two double-height spaces, a living room and a conservatory, with a “bridge” above them – makes the house both “transparent” and filled with light.
The White Wing
Well, it’s not exactly white. It’s more of a beige, white-stone structure that plays with the color of limestone – smoother surfaces are lighter, while rougher ones are darker. This wing unites various elements: it absorbs and interprets the surrounding themes. It responds to everything, yet maintains a cohesive expression – a challenging task! – while also incorporating recognizable features of its own, such as the dynamic cuts at the bottom, top, and middle.
Urban Dunes
The XSA Ramps team designed and built a three-part sports hub for a park in Rostov-on-Don, welcoming people of all ages and fitness levels. The skate plaza, pump track, and playground are all meticulously crafted with details that attract a diverse range of visitors. The technical execution of the shapes and slopes transforms this space into a kind of sculptural composition.
Proportional Growth
The project for the fourth phase of the ÁLIA residential area has been announced. The buildings are situated on an elongated plot – almost a “ray” that shoots out from the center of the area towards the river. Their layout reflects both a response to Moscow’s architectural preferences over the past 15 years, shifting “from blocks to towers”, and an interpretation of the neighboring business park designed by SOM. Additionally, the best apartments here are not located at the very top but closer to the middle, forming a glowing “waistline”.
The “Staircase” Building
In designing the “Details” residential complex in New Moscow, Rais Baishev spiced up the now-popular Moscow theme of a “courtyard” building with an idea drawn from the surrealist drawings by Maurits Escher. He envisioned the stepped silhouettes and descending slopes as a metaphysical mega-staircase, creating a key void within the courtyard that gave the project an internal “spine”. This concept is felt both in the building’s silhouette and on its façades.
Projection of the Quarter
No one doubted that the building that Vladimir Plotkin designed as part of the “Garden Quarters” would be the most modernist of all. And it turned out just that way: while adhering to the common design code, the building successfully combines brick and white stone, rhythmically responding to the neighboring building designed by Ostozhenka, yet tactfully and persistently making a few statements of its own. This includes the projection of the ideal urban development composition “14–9–6”, which can be found right next door, mathematical calculations, including those for various types of terraces (and perhaps the only reminder of the Soviet past of the Kauchuk rubber factory!), and the white “cross-stitch” pattern of the façade grid.
Domus Aurea
In this issue, we examine the “Tessinsky-1” house, designed by Sergey Skuratov and completed in 2023. Located in the middle of the Serebryanicheskaya Embankment district, at the intersection of its main streets, this house assumes a sort of “nodal” role: it not only responds to everything around it and preserves many memories of the former EMA factory within itself, but it weaves all this into a newly directed pattern, reconciling bright “gold” and dark-colored brick, largely with the help of the new, modern-yet-archaic Columba brick, which, come to think about it, is the most precious element here.
The Chimney of Nikola-Lenivets
In this issue, we are examining the “Obelisk House” designed by KATARSIS and built for the Arkhstoyanie 2023 festival. However, it was only finished later on, and this is why we are examining it now. It seems to us that after the “Obelisk House” appeared in Nikola-Lenivets, a dialogue and a few inner connections appeared between the temporary structures built here. These houses no longer look like “accidental neighbors”, more of which below.
​Periscope by the Bay
The jury awarded the second place in the competition for a public and cultural center in Petropavlovsk-Kamchatsky to the companies GORA (“Mountain”) and M4. In the consortium’s proposal, the building resembles a sperm whale with a calf swimming next to it or a periscope, whose lenses capture the most spectacular views from the surrounding landscape.
From Arcs to Dolmens
While working on the competition project for Petropavlovsk-Kamchatsky, ASADOV Architects prioritized the value of the natural and urban environment, aiming to preserve the balance of the location while minimizing the resemblance of the volume that they designed to a “traditional building”. The task was challenging, and the architects created three versions, one of which having been developed after the competition, where their main proposal took third place. However, the point of interest here is not the competition result but the continuity of creative thinking.
Hide and Seek
The ID Moskovskiy house, designed by Stepan Liphart in St. Petersburg, in the courtyards near Moskovskiy Avenue beyond the Obvodny Canal and recently completed, is notable for several reasons. Firstly, it has been realized with considerable accuracy, which is particularly significant as this is the first building where the architect was responsible not only for the facades but also for the layouts, allowing for better integration between the two. On the other hand, this building is interesting as an example of the “germination” of new architecture in the city: it draws on the best examples from the neighborhood and becomes an improved and developed sum of ideas found by the architect in the surrounding context.
The Big Twelve
Yesterday, the winners of the Moscow Mayor’s Architecture Award were announced and honored. Let’s take a look at what was awarded and, in some cases, even critique this esteemed award. After all, there is always room for improvement, right?
Above the Golden Horn
The residential complex “Philosophy” designed by T+T architects in Vladivostok, is one of the new projects in the “Golubinaya Pad” area, changing its development philosophy (pun intended) from single houses to a comprehensive approach. The buildings are organized along public streets, varying in height and format, with one house even executed in gallery typology, featuring a cantilever leaning on an art object.
Nuanced Alternative
How can you rhyme a square and space? Easily! But to do so, you need to rhyme everything you can possibly think of: weave everything together, like in a tensegrity structure, and find your own optics too. The new exhibition at GES-2 does just that, offering its visitor a new perspective on the history of art spanning 150 years, infused with the hope for endless multiplicity of worlds and art histories. Read on to see how this is achieved and how the exhibition design by Evgeny Ace contributes to it.
Blinds for Ice
An ice arena has been constructed in Domodedovo based on a project by Yuri Vissarionov Architects. To prevent the long façade, a technical requirement for winter sports facilities, from appearing monotonous, the architects proposed the use of suspended structures with multidirectional slats. This design protects the ice from direct sunlight while giving the wall texture and detail.