По-русски

​MasterMind: a Neural Network for Developers and Architects

Created by Genpro, this software allows you to generate within half an hour dozens of development and construction options in accordance with the set parameters. At the same time, however, being more focused on the technical aspects, the program does not exclude creative work, and can be used by architects for preparing projects with a subsequent data export to AutoCAD, Revit, and ArchiCAD.

Tatiana Shovskaya

Written by:
Tatiana Shovskaya
Translated by:
Anton Mizonov

30 April 2021
Object
mainImg
Firm:
Genpro
Systems for urban planning based on neural networks and machine learning are emerging everywhere, and in each case, such technologies are developed with regard to the requirements of a particular client and the specifics of the region. The MasterMind technology can be used both on the US and Russian markets. 

author photo

Daniil Katrichenko, Genpro

We already tested our software at one of the New York sites.
The software is in constantly update and functionally expanded. The MasterMind team actively works with various consultants – architects and general planners – and quickly implements new solutions. Among other things, the methods of the standard developed by DOM.RF and KB Strelka are being actively studied and implemented as well.


MasterMind uses generative tools, which means that it can independently create 3D models based on the set conditions; what makes it different is the fact that it works with a site or a small piece of urban land without taking into account the system processes occurring on the city level, and it is mostly focused on housing design.

The program takes into account effective construction and sanitary regulations; it also offers a library of presets consisting of Genpro’s proprietary developments.

In Russia, MasterMind is already used by the company in projects that it does in the Moscow region; there are plans for applying this software in other regions as well. Working with the program starts with identifying the site by its address or geo location; the data is loaded from the Mapbox and OpenStreetMap services, which immediately allows you to visually assess the site’s position in the city and its context in terms of typology and maximum permitted height. If the data, uploaded from these services, seems to be no longer relevant, the program allows you to edit them manually. 

After you enter the borders of the site, the program at once forms the regulation berths and shows possible options of positioning buildings with regard to the context.





Before the program launches the generation process, you need to enter a few parameters into it; their range may vary depending upon the tasks set by the user. The portal offers a calculated standard area; if the user is not satisfied with it, they can specify their own version, and the script will create the required number of buildings for these area indicators. The same holds true for such an important factor as the price of the square meter of the constructed buildings.

Other mandatory givens include ranges of all the apartment floor spaces and the construction height, editable for each section; you can also set the density and typology of construction, minimum and maximum height of the buildings, the height of the first, standard, and maintenance floors, apartment layouts, and a few analytical parameters that influence the composition in terms of height.



Since the program is capable of making a preliminary budget estimate of the project, the data must include the necessary set of economic indicators, such as: the cost of the site, the aggregated cost of structures by the square meter, the estimated cost per square meter of housing, the interest rate, and the construction period.

As was already said, MasterMind works with a library of apartment layouts created on the basis of Genpro’s proprietary developments – for each individual project, you can take from this library the part that you need, or even add other external libraries. 

The program creates thousands of versions of 3D models of the master plan, taking into account insolation requirements, positioning driveways in accordance with fire safety regulations, and even calculating an estimated number of pedestrians. In other words, the program performs a huge amount of purely technical work, where human error is completely eliminated. The next step is that the program itself selects the best possible options, whose number is also editable – by default, there are thirty end versions. With these, you are at once getting such key indicators as floor space, the final costs, the number of apartments, the number of blocks, etc. These numbers will allow you to manually filter the versions by various parameters and/or compare them. You may set the criteria of comparison, and edit their range – because every developer has their own notions of which performance indicators are particularly important during the shortlisting process.

This way, within 30 minutes, the program can produce 30 optimal master plan versions, which already includes massing, planting of all buildings, their number of stories and apartments – this makes MasterMind indispensable for assessing a site, because compared to the work of a designer, the process is accelerated not even by tens, but by hundreds of times.

However, MasterMind is developed for various types of users: it is created not just for project managers and marketing agents but first of all to aid architects and designers. This is why for each of the selected versions the program at once creates BIM models where all the models already have plans, section views, and so on. This model is designed to be uploaded to AutoCADCivil 3D, Revit, or AutoCAD, so that you could work with it further. 

This turns MasterMind into a tool specifically developed for architects that helps them to broaden the range of their search, relieving the architects of the necessity to perform routine processes, performing them with impeccable precision, which allows the architect to focus solely on the creative process. This program is a smart assistant, with whose help the architect gets a large amount of analytical data on the project.

Firm:
Genpro

30 April 2021

Tatiana Shovskaya

Written by:

Tatiana Shovskaya
Translated by:
Anton Mizonov
Headlines now
​The Strategy of Transformation
In this article, we are publishing eight projects of reconstructing postwar Modernist buildings that have been implemented by Tchoban Voss Architekten and showcased in the AEDES gallery at the recent Re-Use exhibition. Parallel to that, we are meditating on the demonstrated approaches and the preservation of things that architectural legislation does not require to preserve.
In the Rhythm of Block Construction
Last week, the housing complex “Ty i Ya” (“You and Me”) was presented, built in the northwest of Moscow. By a number of parameters, it exceeds the originally stated comfort-class format, and, on the other hand, fully meeting the city block construction paradigm, popular in Moscow, demonstrates a few interesting features, such as a new kind of public spaces for the residents, and high-ceilinged apartments on the first floors.
​Five Nonlinear Ones
Recently, at the Moscow Urban Forum, they announced a large-scale project that Zaha Hadid Architects would do for Moscow – the multifunctional housing complex Union Towers designed for Quarter 82 of Khoroshevo-Mnevniki at the commission of KROST development.
​Etudes in Glass
The housing complex, located not far away from the Paveletskaya Railway Station, as a symbol of a sweeping transformation of this area: a composition of towers of different height, ingenious detailing of stained glass windows, and a green lawn in the yard.
A Flyover in Watercolor
For the 100th anniversary of Vladimir Vasilkovsky, the architectural office of Evgeny Gerasimov is reflecting on the Ushakov Flyover, which was designed with input from this artist and architect. In this article, we are showing its watercolors and sketches, including the preliminary ones that were not included in the final project, as well as speaking about the importance of architectural drawing.
​Walking on Clouds
A restaurant in the Khibiny skiing complex: 820 meters above the sea level, sweeping views, a levitation effect, and ingenious engineering solutions.
​Transformation with Multiplication
The Palace of Water Sports in Luzhniki is one of the high-profile and nontrivial reconstructions of recent years, and a project that won one of the first competitions, initiated by Sergey Kuznetsov as the main architect of Moscow. The complex opened 2 years ago; this article about it comes out at the start of the bathing season.
​Sergey Tchoban: “I believe it’s very important to preserve this city as a record...
Although originally we planned to speak in this interview with Sergey Tchoban about high-rise construction, the conversation turned out to be 70% about meditation on the ways of regenerating the historical city and about the role of the city fabric as the most objective and unbiased historical record. And, as for the towers, which manifest social contrasts and leave a lot of junk when torn down, the conversation was about the expected construction norms and regulations. We took this interview one day before the Lakhta-2 project was announced, and this is why this newsbreak is not commented upon in any way in this article.
​Courtyards and Constructivism
In this issue, we are examining the second major block of the “city within a city” Ligovsky City complex, designed and built by A-Len, and combining several trends characteristic of modern urban architecture.
​Inside of a Drawn Grid
Designing the apartment complex PLAY in Danilovskaya Sloboda, ADM architects placed their bet on the imagery of construction. The area where it manifested itself the most vividly was the sophisticated grid of the facades.
​Headquarters of the Future
The project by “Arena Group”, which won in an open competition of ideas for the headquarters of the Italian company FITT, combines futuristic forms, an interesting set of functions, energy efficiency, and subtle references to the archetypes of Italian architecture. Particularly beautiful is the “continuous” fountain. In this issue, we are sharing about the three winners of the competition.
​A Tiered Composition
A little bit of New York in Odessa: an apartment complex designed and built by “Archimatika” with towers, townhouses, a square, and swimming pools.
​The Yard Aesthetics
Organizing the yard of a premium-class housing complex, GAFA architects took care not just about the image that matches the project’s high status, but also about simple human joys, masterfully overcoming the construction regulations.
​MasterMind: a Neural Network for Developers and Architects
Created by Genpro, this software allows you to generate within half an hour dozens of development and construction options in accordance with the set parameters. At the same time, however, being more focused on the technical aspects, the program does not exclude creative work, and can be used by architects for preparing projects with a subsequent data export to AutoCAD, Revit, and ArchiCAD.
This Beetle Has Flown
The story of designing a business center in the Zhukov (“Beetle”) Drive: a number of attempts to preserve a hundred-year-old cold storage facility, at the same time introducing modern buildings interpreting the industrial theme. The project remained on paper, but the story behind it seems to be worth our attention.
​The Childhood Territory
The project of the educational complex within the second stage of “Spanish Quarters” was developed by ASADOV Architects. The project is all about creating a friendly and transparent environment that in itself educates and forms the personality of a child.
Man and the City
Designing this large-scale housing complex, GAFA architects accentuated two types of public spaces: bustling streets with shops and cafes – and a totally natural yard, visually separated as much as possible from the city. Making the most out of the contrast, both work together to make the life of the residents of EVER housing complex eventful and diverse.
​Andy Snow: “I aim for an architecture which is rational and poetic”
The British architect Andy Snow has recently become the chief architect at GENPRO Architects & Engineers. Projects, which Andy Snow did in the UK in collaboration with world-famous architectural firms, scored numerous international awards. In Russia, the architect took part in designing Moscow’s Stanislavsky Factory business center, iLove housing complex, and AFI2B business center on the 2nd Brestskaya Street. In our interview, Andy Snow compared the construction realities in Russia and the UK, and also shared his vision of architectural prospects in Russia.
​The Living Growth
The grand-scale housing complex AFI PARK Vorontsovsky in Moscow’s southwest consists of four towers, a “slab” house, and a kindergarten building. Interestingly, the plastique of the residential buildings is quite active – they seem to be growing before your eyes, responding to the natural context, and first of all opening the views of the nearby park. As for the kindergarten building, it is cute and lyrical, like a little sugar house.
Sergey Skuratov: “A skyscraper is a balance of technology, economic performance, and aesthetic...
In March, two buildings of the Capital Towers complex were built up to a 300-meter elevation mark. In this issue, we are speaking to the creator of Moscow’s cutting-edge skyscrapers: about heights and proportions, technologies and economics, laconicism and beauty of superslim houses, and about the boldest architectural proposal of recent years – the Le Corbusier Tower above the Tsentrosoyuz building.
​The Red Building
The area of Novoslobodskaya has received Maison Rouge – an apartment complex designed by ADM, which continues the wave of renovation, started by the Atmosphere business center, from the side of the Palikha Street.
​The Uplifting Effect
The project of Ostankino Business Park was developed for the land site lying between two metro stations (one operating and the other in construction), and because of that its public space is designed to equally cater for the city people and the office workers. The complex stands every chance of becoming the catalyst for development of the Butyrsky area.
​Binary Opposition
In this article, we are examining a rather rare and interesting case – two projects by Evgeny Gerasimov situated on one street and completed with a five years’ difference, presenting the perfect example of example for analyzing the overall trends and approaches practiced by the architectural company.
Raising the Yard
The housing complex Renome consists of two buildings: a modern stone house and a red-brick factory building of the end of the XIX century, reconstructed by measurements and original drafts. The two buildings are connected by an “inclined” yard – a rare, by Moscow standards, version of geoplastics that smoothly ascends to the roof of the stores lined up along a pedestrian street.
​Hearing the Tune of the Past
The Church of the Beheading of John the Baptist in the park near the Novodevichy Convent was conceived in 2012 in honor of the 200th anniversary of the victory over Napoleon. However, instead of declamatory grandeur and “fanfare”, the architect Ilia Utkin presented a concentrated and prayerful mood, combined with a respectful attitude of this tent-shaped church, which also includes some elements of architecture of orders. The basement floor hosts a museum of excavations found on the site of the church.
​Semantic Shift
The high-end residential complex STORY, situated near the Avtozavodskaya metro station and the former ZIL factory, is delicately inscribed in the contrastive context, while its shape, which combines a regular grid and a stunning “shift” of the main facade, seems to respond to the dramatic history of the place, at the same time, however, allowing for multiple interpretations.
​Yards and Towers: the Samara Experiment
The project of “Samara Arena Park”, proposed by Sergey Skuratov, scored second place in the competition. The project is essentially based on experimenting with typology of residential buildings and gallery/corridor-type city blocks combined with towers – as well as on sensitive response to the context and the urge to turn the complex into a full-fledged urban space providing a wide range of functions and experiences.
​The Fili Duo
The second phase of the Filicity housing complex, designed by ADM architects, is based on the contrast between a 57-story skyscraper 200 meters high and an 11-story brick house. The high-rise building sets a futuristic vector in Moscow housing architecture.
​The Wall and the Tower
The OSA architects have been searching for solutions that could be opposed to the low-rise construction in the center of Khabarovsk, as well as an opportunity to say a new word in the discourse about mass housing.