28.01.2010

Semispherical hinge

  • contemporary architecture

Last year the architectural workshop "Studio 44" completed construction of a new office complex in the very heart of St. Petersburg. It is hard to find a spare area in the density of streets neighboring to the Alexander Nevski Square, for this reason the business center was attached to one of the existing buildings. The new architectural hybrid became a new sight of Telezhnaya streets.

Information:

It is adjusted close by the production-service building of the Leningrad Metro, which had a solid concrete end. The architect had to design a construction harmonious being an independent building and extension of the existing complex. The architects started from the two concepts: the building is a part of the massive volume and is a mark of the crossroads, or rather the acute corner formed here by the street and the lane. The first was clear: the solid end had to be completed as soon as possible with architectural material, to drape and with numerous folds hide at last the dull concrete five storey fire wall. The idea to fix the corner in the urban space directed the architects in a more constructive way and the image of a building-drape turned into an image of building-hinge, or a gear. The architects designed the office complex as a sheaf of glass prisms, like a fan raying from the center of the building, and in the plan the uncommon composition really looks like a gear. To hold the unusual "bunch" and stylistically combine with the neighboring building, on the level of 3-6-floors it is pulled by the round stone belt, which coloring and rhythm of window openings catches the tectonic structure of the building established sixteen years earlier.
Text by: Nikita Yavein, Anna Martovitskaya

Most Recent Stories:

Partner Architects of Archi.ru:

  • Vladimir Kovalev
  • Pavel Andreev
  • Levon Ayrapetov
  • Vsevolod Medvedev
  • Nikolai  Milovidov
  • Natalia Sidorova
  • Sergey Skuratov
  • Stanislav Belykh
  • Anatoly Stolyarchuk
  • Igor  Shvartsman
  • Sergey Oreshkin
  • Sergey Kouznetsov
  • Evgeny Gerasimov
  • Oleg Medinsky
  • Polina Voevodina
  • Sergei Tchoban
  • Mikhail Kanunnikov
  • Daniel  Lorenz
  • Alexander Asadov
  • Anton Nadtochiy
  •  Valery  Lukomsky
  • Katerina Gren
  • Tatiana Zulkharneeva
  • Natalia Shilova
  • Valeria Preobrazhenskaya
  • Alexander Skokan
  • Yuliy Borisov
  • Aleksey Ginzburg
  • Vladimir Plotkin
  • Alexandra Kuzmina
  • Andrey Gnezdilov
  • Ekaterina Kuznetsova
  • Ilia Mashkov
  • Arseny Leonovich
  • Dmitry Likin
  • Nikita Yavein
  • Sergey  Trukhanov
  • Roman Leonidov
  • Nikita Tokarev
  • Andrey Asadov
  • Zurab Bassaria
  • Karen  Saprichyan
  • Vera Butko
  • Oleg Shapiro
  • Vassily Krapivin
  • Julia  Tryaskina
  • Andrey Romanov
  • Konstantin Khodnev

Buildings and Projects: New Additions

  • Russian pavillion in Shanghai / 2010
  • Pavilion for Chacha Ceremonies
  • October Railway Central Museum
  • Vander Park residential complex
  • Danilovskaya Manufactory
  • Apartment building on Staroalekseevskaya street
  • Atomsphera office complex (reconstruction)
  • “Replacement” Project
  • Residential complex